Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Ee/Wmd/Nit 11e/2025 26
|
| Description |
Urgent Flood Protection And Mitigation Work To Reduce Vulnerability Of People By Closing Breach 15 ) Along With Repairing Of Damaged Embkt On Left Ex Zamindary Embkt Of Kethiya River Near House Of Rampada Mandal Occurred Due To Heavy Rainfall
|
| Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
| Tender Id | 2025_IWD_879599_5 |
|
Reference Number |
WBIW/EE/WMD/NIT-11e/2025-26 |
| Tender Fee | 0 |
| EMD | 3163 |
| Tender Value | |
| Place | Ghatal |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1982384 |
| Start Date | July 17, 2025 16:30 |
| End Date |
Expired
23/07/2025
Expired 348 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Wbiw/ee/wmd/nit-12e/2025-26
Urgent flood protection and mitigation work to reduce vulnerability of people by closing breach100 m along with repairing of damaged embkt on r bank of katan khal near house of biswanath soren occurred due to heavy rainfall
Read moreFlood protection and mitigation work of embankment by closing breach for a length of 280.0 m of kethia khal (right bank) for reducing vulnerability of people near land of subrata sarkar (reach-1,120.0m), debabrata sarkar (reach-ii,90.0m)
Flood protection and mitigation work of embankment by closing breach for a length of 280.0 m of kethia khal (right bank) for reducing vulnerability of people near land of subrata sarkar (reach-1,120.0m), debabrata sarkar (reach-ii,90.0m)
Read morePower house right bank road terrace protection works damaged to due to severe flood occurred in teesta river
Power house right bank road terrace protection works damaged to due to severe flood occurred in teesta river
Read moreWbiw/ee/wmd/esnit-18/2025-26
Urgent flood protection and mitigation work to reduce vulnerability of people by protection of river bank length 300 m at l bank of kangsaboti occurred due to heavy rainfall and subsequently high discharge from14.07.2025 to18.7.25at mouza manidaha
Read moreFlood protection and mitigation works of river bank by mending slip for a length of 70.00 m at dhoba hana of silabati river (right side) village-srirampur for reducing vulnerability of people within mouza-srirampur , bandipur-i g.p.
Flood protection and mitigation works of river bank by mending slip for a length of 70.00 m at dhoba hana of silabati river (right side) village-srirampur for reducing vulnerability of people within mouza-srirampur , bandipur-i g.p.
Read moreWbiw/ee/wmd/e-nit-05e/2023-24, sl-01
Urgent flood protection and mitigation works by breach closing at left bank of mmc to reduce vulnerability of prople due to heavy rainfall and high discharge from 01.10.23 to 06.10.23 at dakshin khatal under block and p.s.-panskura, district-p.medini
Read moreRestoration of rain damages occurred due to heavy rainfall flash flood during the monsoon of the year 2023, 2024 and 2025 under lwss markanda tata pani
Restoration of rain damages occurred due to heavy rainfall flash flood during the monsoon of the year 2023, 2024 and 2025 under lwss markanda tata pani
Read moreMitigation of flood risk in river beas by extension of motla and mehtabpur bandh along left edge of river beas in tehsil mukerian, distt. hoshiarpur
Mitigation of flood risk in river beas by extension of motla and mehtabpur bandh along left edge of river beas in tehsil mukerian, distt. hoshiarpur
Read moreMitigation of flood risk in river beas by raising of motla and mehtabpur bandh along left edget of river beas in tehsil mukerian, distt. hoshiarpur
Mitigation of flood risk in river beas by raising of motla and mehtabpur bandh along left edget of river beas in tehsil mukerian, distt. hoshiarpur
Read moreTemporary restoration of chatta to mohalla brahmana road by way of providing and laying of wire crates, damages occurred due to heavy rainfall flash flood in the m/o august 2025 length 1.00 km
Temporary restoration of chatta to mohalla brahmana road by way of providing and laying of wire crates, damages occurred due to heavy rainfall flash flood in the m/o august 2025 length 1.00 km
Read moreof your Industry type