Tender Details
Particulars | Details |
---|---|
Title |
Installation And Commissioning Of 220 Kv Bus Bar Protection Panel System At 220 Kv S/S Mirzapur Under Etd Mirzapur.
|
Description |
Installation And Commissioning Of 220 Kv Bus Bar Protection Panel System At 220 Kv S/S Mirzapur Under Etd Mirzapur.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2024_UPTCL_879249_1 |
Reference Number |
54/2023-24/ETC/Mzp |
Tender Fee | 590 |
EMD | 1000 |
Tender Value | |
Place | Mirzapur |
Link | https://etender.up.nic.in |
Start Date | January 10, 2024 00:00 |
End Date |
12/02/2024 ( Expired 455 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreAAAAAAAAAA
Login to viewSupply and fitting fixing of main switch, pipe, fittings and other additional electro-mechanical work at ohr site of puncha water supply scheme under purulia mechanical division phe dte.
Read moreJp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreMaintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreSupply installation commissioning of high resolution manometry system solid state at aiims bhubaneswar
Supply installation commissioning of high resolution manometry system solid state at aiims bhubaneswar
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreof your Industry type