Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Protection Hand Rail Grill Work Over The Crash Barrier At Arumparthapuram Rob Ch.33.000, Puducherry
|
| Description |
Providing Protection Hand Rail Grill Work Over The Crash Barrier At Arumparthapuram Rob Ch.33.000, Puducherry
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2024_PWDC1_16837_1 |
|
Reference Number |
06/PW/NH/2024-25 |
| Tender Fee | 525 |
| EMD | 82154 |
| Tender Value | - |
| Place | Puducherry |
| Link |
View Original Tender Notice
https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=17180 |
| Start Date | November 12, 2024 22:05 |
| End Date |
Expired
20/11/2024
Expired 694 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Special repair work construction of rcc crash barrier at urban stretch in median from ch. 308.359 to 315.500 of ch. jodhpur-pali road on section of nh-62 in dbfot stretch
Special repair work construction of rcc crash barrier at urban stretch in median from ch. 308.359 to 315.500 of ch. jodhpur-pali road on section of nh-62 in dbfot stretch
Read moreD/o expressway (providing and erecting w metal beam crash barrier on both side of noida-greater noida expressway service road from ch. 0.00km to 10.00km) noida
D/o expressway (providing and erecting w metal beam crash barrier on both side of noida-greater noida expressway service road from ch. 0.00km to 10.00km) noida
Read moreAppointment of consultant for techno-economic feasibility study, detailed engineering, engineering design, cost estimates, tender documents and technical specifications for construction of a 4-lane road over bridge (rob) for inter terminal rail handl
Appointment of consultant for techno-economic feasibility study, detailed engineering, engineering design, cost estimates, tender documents and technical specifications for construction of a 4-lane road over bridge (rob) for inter terminal rail handl
Read moreConstruction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellan
Construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellan
Read moreConstruction of gopalpura mataji to singhpura service road ch. 289/100 to 289/800 bhs length (650 mtr.) and for rcc crash barrier and safety work from km 263/160 to km 306/700 on nh-52 in the state of rajasthan
Construction of gopalpura mataji to singhpura service road ch. 289/100 to 289/800 bhs length (650 mtr.) and for rcc crash barrier and safety work from km 263/160 to km 306/700 on nh-52 in the state of rajasthan
Read moreConstruction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Read moreHighway guard rail system crash barrier 1,highway guard rail system crash barrier 2,highway guard r
Read more
Guide rail reflectors 1,guide rail reflectors 2,crash barrier 1,crash barrier 2,gabion box 1
Read more
Guide rail reflectors 1,guide rail reflectors 2,crash barrier 1,crash barrier 2,gabion box 1
Read more
Providing and erecting metal crash barrier at nallathur road from ch.3-000 to 3-100 and ch.4-540 to 4-640 in nedungadu commune.
Providing and erecting metal crash barrier at nallathur road from ch.3-000 to 3-100 and ch.4-540 to 4-640 in nedungadu commune.
Read moreof your Industry type