Tender Details

Particulars Details
Title
Custom Bid For Services Repairing Rubber Lining Of Acid Storage Tank Hcl 30 For Cpu Regeneration
Description
Organisation Contracts and Materials | Ministry of Power
Tender Id GEM/2025/B/6048551
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date March 20, 2025 14:56
End Date
Expired 31/03/2025

Expired 559 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Soma Das
Ministry: Ministry Of Power
Department: Contracts And Materials
Organisation: Damodar Valley Corporation

Technical Evaluation Results

S.No. Seller Name Participated On MSE/MII Status Status
1 KOLEY ENTERPRISE 28-03-2025 21:56:56 MSE Qualified
2 M/S Swapna Engineers 30-03-2025 16:53:02 MSE Qualified
3 S.A. ENGINEERING WORKS 28-03-2025 22:06:12 MSE Qualified
4 SHIVDULARI ENTERPRISES PRIVATE LIMITED 29-03-2025 12:29:14 MSE Disqualified
5 TECHNO SYNDICATE 27-03-2025 11:50:06 MSE Disqualified
6 TEMSEC RUBBER PVT LTD 25-03-2025 16:23:53 MSE Qualified
Similar Tenders
Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system

Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system

Read more
Limited tender for frp lining in underground tank chambers

Limited tender for frp lining in underground tank chambers

Read more
Tggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant

Tggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant

Read more
Mnklis phase ii package 3 a) enhancement of capacities of thirumaladevuni tank, laxmipur tank and earlapally tank, b) improvements and strengthening of doultabad tank, husnabad tank, kodangal tank and bomraspet tank, c) earthwork excavation, formation of embankment and lining, including construction of cm and cd works for main canals, distributaries, minors and sub minors of utkoor tank, thirumaladevuni tank, jayamma tank, kanukurthy tank, laxmipur tank, earlapally tank, husnabad tank, kodan

Mnklis phase ii package 3 a) enhancement of capacities of thirumaladevuni tank, laxmipur tank and earlapally tank, b) improvements and strengthening of doultabad tank, husnabad tank, kodangal tank and bomraspet tank, c) earthwork excavation, formation of embankment and lining, including construction of cm and cd works for main canals, distributaries, minors and sub minors of utkoor tank, thirumaladevuni tank, jayamma tank, kanukurthy tank, laxmipur tank, earlapally tank, husnabad tank, kodangal tank, bomraspet tank and gravity canal from kanukurthy tank to bomraspet tank, d) construction of lift iv comprising approach channel, pump house and pressure main at kodangal tank under makthal narayanpet kodangal lift irrigation scheme.

Read more
Changes to be made for executive engineer office of masab tank at 5th floor in abids parking complex in circle-30, gz, ghmc for administrative works (rs. 12.10 lakhs)

Changes to be made for executive engineer office of masab tank at 5th floor in abids parking complex in circle-30, gz, ghmc for administrative works (rs. 12.10 lakhs)

Read more
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Read more
Fabrication, rubber lining and supply of rubber lined 100 m3 hcl acid storage tanks

Fabrication, rubber lining and supply of rubber lined 100 m3 hcl acid storage tanks.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise