Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Civil Circle Forming And Raising The East Side Lad Bund Using Ash Mixed With Mill Reject And Red Gravel For A Length Of 100m From Ash Over Flowing Portion (Reach Ii)
|
| Description |
Mtps I Civil Circle Forming And Raising The East Side Lad Bund Using Ash Mixed With Mill Reject And Red Gravel For A Length Of 100m From Ash Over Flowing Portion (Reach Ii)
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_343820_1 |
|
Reference Number |
SE / CIVIL / MTPS I / SPN NO 22 / 2023-2024 |
| Tender Fee | 0 |
| EMD | 5700 |
| Tender Value | - |
| Place | Office of the SE / Civil / MTPS I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | July 15, 2023 21:00 |
| End Date |
Expired
27/07/2023
Expired 1137 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i civil circle forming and raising the east side lad bund using ash mixed with mill reject and red gravel for a length of 100m from ash over flowing portion (reach iii)
Mtps i civil circle forming and raising the east side lad bund using ash mixed with mill reject and red gravel for a length of 100m from ash over flowing portion (reach iii)
Read moreAsh dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of primary pond south side using ash mixed with mill reject and red gravel in ash dyke area
Ash dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of primary pond south side using ash mixed with mill reject and red gravel in ash dyke area
Read moreMtps i m ii oahs wet ash strengthening of the bunds and segregation of lad
Mtps i m ii oahs wet ash strengthening of the bunds and segregation of lad
Read moreMtps-i m ii oahs wet ash strengthening of the bunds and segregation of lad
Mtps-i m ii oahs wet ash strengthening of the bunds and segregation of lad
Read moreAsh dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of secondary pond east side and cross bund using ash mixed with mill reject, red gravel and rough stone in ash dyke
Ash dyke heavy floods breaching of ash dyke works to be attended on war footing basis protection arrangements in the breached portion of secondary pond east side and cross bund using ash mixed with mill reject, red gravel and rough stone in ash dyke
Read moreMtps i - civil circle - rough stone packing and ash bag supporting work for pring sliding of earthern bund lad west side and hanging of ash slurry pipe lines at lad
Mtps i - civil circle - rough stone packing and ash bag supporting work for pring sliding of earthern bund lad west side and hanging of ash slurry pipe lines at lad
Read moreProviding ring bund by mill reject with gravel along the inspection road from ash dyke gate to ch 120 m at ttps
Providing ring bund by mill reject with gravel along the&#x0d inspection road from ash dyke gate to ch 120 m at ttps
Read moreProviding ring bund by mill reject with gravel along the inspection road from ash dyke gate to ch 120 m at ttps
Providing ring bund by mill reject with gravel along the inspection road from ash dyke gate to ch 120 m at ttps
Read moreMtps i m ii oahs removal and transportation of retrieved ash from primary pond i and ii to lad uad
Mtps i m ii oahs removal and transportation of retrieved ash from primary pond i and ii to lad uad
Read moreMtps i oah wet ash strengthening of the bunds segregation of lad removal and transportation of accumulated ash over and under the ash slurry line at the time of attending the breakdown b1 to uad
Mtps i oah wet ash strengthening of the bunds segregation of lad removal and transportation of accumulated ash over and under the ash slurry line at the time of attending the breakdown b1 to uad
Read moreof your Industry type