Tender Details
About Tender
⚡️bid Invitation: 33 And 11 Kv Underground Cable Fault Locating Services ⚡️ Madhyanchal Vidyut Vitran Nigam Ltd, A State Government Undertaking, Is Seeking Bids From Experienced Service Providers For The 33 And 11 Kv Underground Cable Fault Locating Work At Edd Fatehpur. 📅 Bid Submission Deadline: April 15, 2024, 5:00 Pm Tender Fee: Inr 1180 Emd: Inr 5200 Interested Bidders Must Possess The Necessary Technical Expertise And Equipment To Accurately Locate And Diagnose Faults In Underground Power Cables. Detailed Proposals, Including Methodology, Pricing, And Timelines, Are Required. Keywords: 33 And 11 Kv, Underground Cable, Fault Locating, Electrical Services, Madhyanchal Vidyut Vitran Nigam Ltd, State Govt. And Ut, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
33 And 11 Kv Underground Cable Fault Locating Work
|
Description |
33 And 11 Kv Underground Cable Fault&Amp#X0d
Locating Work
|
Organisation | Madhyanchal Vidyut Vitran Nigam Ltd | State Govt. and UT |
Tender Id | 2024_MVVNL_918948_1 |
Reference Number |
168/2023-24/EDC BARABANKI |
Tender Fee | 1180 |
EMD | 5200 |
Tender Value | |
Place | EDD FATEHPUR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1592517 |
Start Date | April 10, 2024 22:25 |
End Date |
15/04/2024 ( Expired 403 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreEngaging expert for cable jointing work
Engaging expert for cable jointing work including excavation and refilling of earth along with supply of material for rectification of fault in 33 kv and 11 kv xlpe cable and abc cable on as and when required basis for a period of 01 year
Read moreof your Industry type