Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ranpur Station: Provision Of 02 Nos Liftwell Against The Sanctioned Work Bhavnagar Division Provision Of 35 Nos Lifts At Stations(amrit Station)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79751758 |
|
Reference Number |
208-2024-25 |
| Tender Fee | 0 |
| EMD | 95600 |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79751758/viewNitPdf_4845904.pdf |
| Start Date | January 29, 2025 02:53 |
| End Date |
Expired
19/02/2025
Expired 606 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw-i:-provision of two lifts each at jru,byd,panp & ntw railway stations on the existing fob.sw-ii:-ajp-provision of two lifts each at ajp railway stations on the existing fob
Sw-i:-provision of two lifts each at jru,byd,panp & ntw railway stations on the existing fob.sw-ii:-ajp-provision of two lifts each at ajp railway stations on the existing fob
Read moreVadodara division: provision of passenger lifts for divyangjan at seven stations (geratpur, kanij, nenpur, nandesari, makarpura, palej and samlaya) - total 18 nos lifts.
Vadodara division: provision of passenger lifts for divyangjan at seven stations (geratpur, kanij, nenpur, nandesari, makarpura, palej and samlaya) - total 18 nos lifts.
Read moreEscalator works- provision of escalator against development work of amrit station scheme (05 nos stns) phase-ii viz. ddj,spr,mmg,cg & nh. (excluding cg station)
Escalator works- provision of escalator against development work of amrit station scheme (05 nos stns) phase-ii viz. ddj,spr,mmg,cg & nh. (excluding cg station)
Read more1) provision of two lifts each at panp, jru, byd and ntw railway stations on the existing fob (total 8 lifts). 2) provision of one lift each at pf-1 and pf-2 on existing fob at ajp and one lift on main entry to railway station at dru (total-3 lifts).
1) provision of two lifts each at panp, jru, byd and ntw railway stations on the existing fob (total 8 lifts). 2) provision of one lift each at pf-1 and pf-2 on existing fob at ajp and one lift on main entry to railway station at dru (total-3 lifts).
Read moreProvision of fire and surge protection systems at ofc huts and important telecom installations, upgradation of datacom equipment for uts/prs networks, and provision of cctv cameras at various stations/locations under the amrit bharat station scheme over khurda road division.
Provision of fire and surge protection systems at ofc huts and important telecom installations, upgradation of datacom equipment for uts/prs networks, and provision of cctv cameras at various stations/locations under the amrit bharat station scheme over khurda road division.
Read moreOhe modification work against sanctioned works under ph-53 over firozpur division in c/w (i)- raising of passenger platform from rl/ll to hl pass. pf at 08 stations blnd, kupr, ldw, bhm, jjj, gsr, kash, scq & mxp under sr.den-i/fzr, (ii)- provision of standard ramp for passenger to existing fob at 06 stations hussainpur, sultanpur lodhi, lohian khas, malawala khas, firozpur city & jalalabad under den/hq/fzr and (iii)- provision of standard ramp for passanger to existing fobs at 06 stat
Ohe modification work against sanctioned works under ph-53 over firozpur division in c/w (i)- raising of passenger platform from rl/ll to hl pass. pf at 08 stations blnd, kupr, ldw, bhm, jjj, gsr, kash, scq & mxp under sr.den-i/fzr, (ii)- provision of standard ramp for passenger to existing fob at 06 stations hussainpur, sultanpur lodhi, lohian khas, malawala khas, firozpur city & jalalabad under den/hq/fzr and (iii)- provision of standard ramp for passanger to existing fobs at 06 stat
Read moreOhe arrangements in connection with 1. layout correction for point no. 58a, 58b and trap no. 108 at walayar yard. 2. provision of track machine stabling facilities at palakkad and kuttipuram stations. 3.provision of 6m wide fob connecting platforms and second entry at shoranur station under amrit bharat scheme.
Ohe arrangements in connection with 1. layout correction for point no. 58a, 58b and trap no. 108 at walayar yard. 2. provision of track machine stabling facilities at palakkad and kuttipuram stations. 3.provision of 6m wide fob connecting platforms and second entry at shoranur station under amrit bharat scheme.
Read moreElectrical work i/c with (i) provision of construction of ballast less track on main line (pf line) at jodhpur station (pf 1 &3 ). (ii) provision of construction of ballast less track on main line (pf line) at jodhpur station (pf 5 &6). (iii) provision of cctv camera in & outside of lifts at 10 locations/stations of ju division.
Electrical work i/c with (i) provision of construction of ballast less track on main line (pf line) at jodhpur station (pf 1 &3 ). (ii) provision of construction of ballast less track on main line (pf line) at jodhpur station (pf 5 &6). (iii) provision of cctv camera in & outside of lifts at 10 locations/stations of ju division.
Read moreSignal & telecommunication work in connection with provision of central fob 12m wide including ramp in connection with development of amrit bharat station at bwn, bhp, rph, abka, ndae, kwae, bly, she, cgr,tak, az & kgle and provision of 6m wide fob with lifts at all platforms at konnagar (kog) station & uttarpara (upa) station in hwh division and other near by adjacent stations srp station and others under abss and trip maintenance / advance inspection centre for inspection and m
Signal & telecommunication work in connection with provision of central fob 12m wide including ramp in connection with development of amrit bharat station at bwn, bhp, rph, abka, ndae, kwae, bly, she, cgr,tak, az & kgle and provision of 6m wide fob with lifts at all platforms at konnagar (kog) station & uttarpara (upa) station in hwh division and other near by adjacent stations srp station and others under abss and trip maintenance / advance inspection centre for inspection and m
Read moreElectrical/g work for : part-a : replacement of various psi equipment on overaged and condition basis along with other associated works in various switching stations of jhansi division. part-b : renovation of battery charging room and supply, installation, civil work and commissioning of rain water testing plant at diesel loco shed jhansi. part-c :jhs div: provision of 04 nos. passenger lifts at chitrakoot dham karvi and mahoba stations.
Electrical/g work for : part-a : replacement of various psi equipment on overaged and condition basis along with other associated works in various switching stations of jhansi division. part-b : renovation of battery charging room and supply, installation, civil work and commissioning of rain water testing plant at diesel loco shed jhansi. part-c :jhs div: provision of 04 nos. passenger lifts at chitrakoot dham karvi and mahoba stations.
Read moreof your Industry type