Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 400k V Interconnection Line Between Kudankulam Nuclear Power Plant Kknpp 1,2 And Kknpp 3,4 At Npcil, Kudankulam Site
|
Description |
Construction Of 400k V Interconnection Line Between Kudankulam Nuclear Power Plant Kknpp 1,2 And Kknpp 3,4 At Npcil, Kudankulam Site
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 24924 |
Reference Number |
SR2/NT/W-TW/DOM/C00/24/15498 |
Tender Fee | 25000 |
EMD | 0 |
Tender Value | |
Place | Tamilnadu |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=64e454e9-4bd6-4cee-adef-52496ecfa334 |
Start Date | November 19, 2024 19:30 |
End Date |
18/12/2024 ( Expired 171 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of sgr hall, fire wall, store room, turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj
Construction of sgr hall, fire wall, store room,turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read moreConstruction of retaining wall and stabilization of slope for new crushing plant at sitapatore mine.
Construction of retaining wall and stabilization of slope for new crushing plant at sitapatore mine.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreSurvey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Survey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Read moreCanal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Read moreEstablishing of 2 x 500 mva, 400/220 kv sub-station at kumher (distt. bharatpur) alongwith 400kv, 1x125 mvar, shunt reactor (bus type) and 4 x80 mvar, shunt reactor (line type) and associated bays on turnkey basis
Establishing of 2 x 500 mva, 400/220 kv sub-station at kumher (distt. bharatpur) alongwith 400kv, 1x125 mvar, shunt reactor (bus type) and 4 x80 mvar, shunt reactor (line type) and associated bays including supply of all equipments/materials, erectio
Read moreConstruction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.