Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Apron And Two Link Taxiways At Darbhanga Airport Phase 1. Sh Soil Testing
|
| Description |
Construction Of Apron And Two Link Taxiways At Darbhanga Airport Phase 1. Sh Soil Testing
|
| Organisation | Airports Authority of India | Public Sector Undertakings |
| Tender Id | 2024_AAI_219266_1 |
|
Reference Number |
AAI/DBR/SM(E-C)/CW-17/Soil Test/ |
| Tender Fee | 1180 |
| EMD | 6829 |
| Tender Value | - |
| Place | Darbhanga Airport, Darbhanga |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=243517 |
| Start Date | December 13, 2024 14:30 |
| End Date |
Expired
06/01/2025
Expired 647 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of link taxi track for proposed new fto at kishangarh airport. sh-electrical work.
Construction of link taxi track for proposed new fto at kishangarh airport. sh-electrical work.
Read moreOil testing & filtration of traction transformer & rewinding of blower motor including blower fan(runner) of 3 phase memu coaches at crws/bpl for two years 2026-27 & 2027-28.
Oil testing & filtration of traction transformer & rewinding of blower motor including blower fan(runner) of 3 phase memu coaches at crws/bpl for two years 2026-27 & 2027-28.
Read moreUpgradation work of 15 meter rcc bridge for one lane to two lane at km 26 of badethi-banchaura-badrigaad state highway (sh-16) under state sector (adb funded) at chinyalisaur, district uttarkashi.(phase-i) (as per rfq and tor)
Upgradation work of 15 meter rcc bridge for one lane to two lane at km 26 of badethi-banchaura-badrigaad state highway (sh-16) under state sector (adb funded) at chinyalisaur, district uttarkashi.(phase-i) (as per rfq and tor)
Read moreDesign, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway
Design, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway
Read morePlb pipe,96 f optical fibre cable,dwc pipes,rcc chambers,rcc route joint indicators,plb push fit couplers,ujc 96f,ftb 96f,fdms sd type,pig tails- sc pigtail,patch chords 20 mts sc to sc pig tail,insulation tapes,20 mm hose pipe,cable ties tapes misc,causion tape,trenching cost based on the soil,pipe laying charge,cement concrete,cable pulling blowing,dwc laying charges,labour charges for testing and splicing,distribution of stores to routes,loading and unloading charges,unforeseen,coral make iris ivdx cloud server,coral make 192 port media gateway,ip phone model no grp 2604,d link 10 100 1000 giga switch 24 port network,d-link cat 6 ethernet lan cable,d-link single plate io modules,d-link 3 mtrs length patch cards,6-f ofc sm armored cable finolex make,d-link 4 u rack with accessories,cost of 40 mm plb duct for fibre laying,lc-lc fibre patch cards 3 mtrs length,d-link 12 u rack with accessories,digging of the cable trenchaning,ofc cable laying charges by using plb duct,ethernet lan cable laying charges,100 pai
Plb pipe,96 f optical fibre cable,dwc pipes,rcc chambers,rcc route joint indicators,plb push fit couplers,ujc 96f,ftb 96f,fdms sd type,pig tails- sc pigtail,patch chords 20 mts sc to sc pig tail,insulation tapes,20 mm hose pipe,cable ties tapes misc,causion tape,trenching cost based on the soil,pipe laying charge,cement concrete,cable pulling blowing,dwc laying charges,labour charges for testing and splicing,distribution of stores to routes,loading and unloading charges,unforeseen,coral make iris ivdx cloud server,coral make 192 port media gateway,ip phone model no grp 2604,d link 10 100 1000 giga switch 24 port network,d-link cat 6 ethernet lan cable,d-link single plate io modules,d-link 3 mtrs length patch cards,6-f ofc sm armored cable finolex make,d-link 4 u rack with accessories,cost of 40 mm plb duct for fibre laying,lc-lc fibre patch cards 3 mtrs length,d-link 12 u rack with accessories,digging of the cable trenchaning,ofc cable laying charges by using plb duct,ethernet lan cable laying charges,100 pai
Read moreDismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Dismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Read moreGps current interrupter timer, kristron make complete with gps antenna tested ok pair,supply, installation, testing and commissioning of permanent reference electrode zn znso4,dc output voltmeter, digital type,suitable cable glands and accessories,alternating current input digit ammeter,fuse holder complete with slow blow glass fuse for gps timer circuit,filter fuse holder complete with 10a hrc fuse link,psp meter complete with t filter circuitry and associated signal conditioning components oem certified,output voltage control potentiometer, multi turn type,mother board m b kristron 75v 75a tr unit,display board d b kristron 75v 75a tr unit,complete set of controller cards 04 nos controller cards,output fuse holders top and base,mains on indicator,104c controller card,supply of material required for provision of two dedicated earthing stations hp nagar west 1 ohm for la 1 and la 2 cp contractors scope,supply and installation hrc fuse link, 10a filter circuit,filter capacitor,supply of cathode header cable pi
Gps current interrupter timer, kristron make complete with gps antenna tested ok pair,supply, installation, testing and commissioning of permanent reference electrode zn znso4,dc output voltmeter, digital type,suitable cable glands and accessories,alternating current input digit ammeter,fuse holder complete with slow blow glass fuse for gps timer circuit,filter fuse holder complete with 10a hrc fuse link,psp meter complete with t filter circuitry and associated signal conditioning components oem certified,output voltage control potentiometer, multi turn type,mother board m b kristron 75v 75a tr unit,display board d b kristron 75v 75a tr unit,complete set of controller cards 04 nos controller cards,output fuse holders top and base,mains on indicator,104c controller card,supply of material required for provision of two dedicated earthing stations hp nagar west 1 ohm for la 1 and la 2 cp contractors scope,supply and installation hrc fuse link, 10a filter circuit,filter capacitor,supply of cathode header cable pi
Read moreConstruction of apron, two link taxiways and airside infrastructure at proposed new civil enclaves at darbhanga airport phase-1.
Development of new civil enclave at darbhanga, bihar. sh- construction of apron, two link taxiways and airside infrastructure at proposed new civil enclaves at darbhanga airport phase-1.
Read moreDevelopment of new civil enclave at bagdogra airport. sh- construction of apron, link taxiways and airside infrastructure (phase-i)
Development of new civil enclave at bagdogra airport. sh - construction of apron, link taxiways and airside infrastructure (phase-i)
Read moreDevelopment of new civil enclave at agra airport. sh- extension of runway, ptt and construction of apron, taxiways, resa, gse area, link road and associated works.
Development of new civil enclave at agra airport. sh- extension of runway, ptt and construction of apron, taxiways, resa, gse area, link road and associated works.
Read moreof your Industry type