Tender Details
Particulars | Details |
---|---|
Title |
Undertaking De Siltation Of Village Pond With Stone Pitching Work
|
Description |
Undertaking De Siltation Of Village Pond With Stone Pitching Work
|
Organisation | Central Public Procurement Portal 2 |
Tender Id | 2023_IREL_174778_1 |
Reference Number |
01-23010/R |
Tender Fee | 0 |
EMD | 83201 |
Tender Value | |
Place | IREL (India) Limited, OSCOM, Matikhalo |
Link | https://etenders.gov.in |
Start Date | November 17, 2023 22:30 |
End Date |
08/12/2023 ( Expired 527 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj
Construction of new 4 lane bridge over umardashi river with approachesat km. 153.300 design km. 153.080 of nh 58 near palanpur merwada village in the state of gujarat. job no. 058.gj.2024.25.776 upc_m.00058.25776.gj
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreConstruction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreof your Industry type