Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit Ii Coh 2024 25 Renewal Of Eroded Style 07 Expansion Joint Removal And Re Fixing Of Fabric Compensator And Other Related Works Etc In Both A And B Sides
|
| Description |
Mtps I Bm Unit Ii Coh 2024 25 Renewal Of Eroded Style 07 Expansion Joint Removal And Re Fixing Of Fabric Compensator And Other Related Works Etc In Both A And B Sides
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_455899_1 |
|
Reference Number |
CE/MTPS-I/SE/M-I/BM/ OT.24 / 2024-25 |
| Tender Fee | 0 |
| EMD | 4800 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=542204 |
| Start Date | June 20, 2024 18:30 |
| End Date |
Expired
04/07/2024
Expired 832 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i bm unit ii coh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a and b sides
Mtps i bm unit ii coh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a and b sides
Read moreMtps i bm unit iv aoh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a and b sides
Mtps i bm unit iv aoh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a and b sides
Read moreMtps i bm unit iii aoh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a anb b sides
Mtps i bm unit iii aoh 2024 25 renewal of eroded style 07 expansion joint removal refixing and other related works etc in both a anb b sides
Read moreInstallation and fixing of fabric expansion joint over existing metallic compensator to arrest air ingress
Installation and fixing of fabric expansion joint over existing metallic compensator to arrest air ingress during overhauling of unit5 of 250 mw, ctps, ptpp, parichha
Read moreExpansion joint fabric of primary dedusting system tag no. ew1_32_21-myr0100,expansion joint fabric
Read more
Expansion joint fabric of primary dedusting system tag no. ew1_32_21-myr0100,expansion joint fabric
Read more
Fabric expansion joint compresing diff. layers temp 400c 40m/pipe,fabric expansion joint compresing
Read more
of your Industry type