Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Making Arrangement To Supply Industrial Water Supply To Urdhan Ocm From Nehariya Ugm Under Nehariya Sub Area.
|
| Description |
Making Arrangement To Supply Industrial Water Supply To Urdhan Ocm From Nehariya Ugm Under Nehariya Sub Area.
|
| Organisation | Western Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_WCL_332233_1 |
|
Reference Number |
pe3350-civ-s-e064-2024-25 |
| Tender Fee | 0 |
| EMD | 20000 |
| Tender Value | - |
| Place | NEHARIYA SUB AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344418 |
| Start Date | March 12, 2025 22:30 |
| End Date |
Expired
22/03/2025
Expired 551 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreMaking arrangement to supply industrial water supply to urdhan ocm from nehariya ugm under nehariya sub area.
Making arrangement to supply industrial water supply to urdhan ocm from nehariya ugm under nehariya sub area.
Read moreRepairing of toilets at offices of urdhan ocm, mathani ugm and nehariya ugm under nehariya sub area.
Repairing of toilets at offices of urdhan ocm, mathani ugm and
 nehariya ugm under nehariya sub area.
Read moreMonsoon preparation works at urdhan ocm and nehariya ugm (2025-2026) under nehariya sub area of pench area .
Monsoon preparation works at urdhan ocm and nehariya ugm (2025-2026) under nehariya sub area of pench area .
Read moreAssistance to firefighting work at urdhan ocm under nehariya sub area.
Assistance to firefighting work at urdhan ocm under nehariya sub area.
Read moreRepair and maintenance of industrial pipeline (from nehariya ugm to urdhan ocm and dhankasa ugm) and domestic water pipeline (from haranbhatta pump house to pv colony) as and when required basis for a period of two (02) years under nehariya sub area
Repair and maintenance of industrial pipeline (from nehariya ugm to urdhan ocm and dhankasa ugm) and domestic water pipeline (from haranbhatta pump house to pv colony) as and when required basis for a period of two (02) years under nehariya sub area
Read moreRepair and maintenance of industrial pipeline (from nehariya ugm to urdhan ocm and dhankasa ugm) and domestic water pipeline (from haranbhatta pump house to pv colony) as and when required basis for a period of two (02) years under nehariya sub area
Repair and maintenance of industrial pipeline (from nehariya ugm to urdhan ocm and dhankasa ugm) and domestic water pipeline (from haranbhatta pump house to pv colony) as and when required basis for a period of two (02) years under nehariya sub area
Read moreExcavation by mechanical means at urdhan ocm, nehariya ugm and dhanaksa ugm as and when required basis for a period of 365 days under pench area.
Excavation by mechanical means at
 urdhan ocm, nehariya ugm and dhanaksa ugm as and when required basis for a period of 365 days under pench area.
Read moreLoosening of compacted coal from coal stock yard at urdhan ocm under nehariya sub area.
Loosening of compacted coal from coal stock yard at urdhan ocm under nehariya sub area.
Read moreProviding and fixing boundary pillars along forest boundary of urdhan ocm under nehariya sub-area.
Providing and fixing boundary pillars along forest boundary of urdhan ocm under nehariya sub-area.
Read moreof your Industry type