Tender Details

Particulars Details
Title
Truck Loading Conveyor
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/5601645
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date November 13, 2024 02:45
End Date
Expired 04/12/2024

Expired 638 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: cancelled
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army
Similar Tenders
Repairing of screw pumps, classifier and grit machine no. 1, belt conveyor, supply of spare bearings and pinion, etc. at konia mps, varanasi

Repairing of screw pumps, classifier and grit machine no. 1, belt conveyor, supply of spare bearings and pinion, etc. at konia mps, varanasi

Read more
Outsourcing of services for carrying out scanning and auditing of steel cord conveyor belts working at various chps for a period of two years. in division no:corp-mp.

Outsourcing of services for carrying out scanning and auditing of steel cord conveyor belts working at various chps for a period of two years. in division no:corp-mp.

Read more
Empanelment of agencies and fixing rate contract on per metric tonne (mt) basis for complete clearing, removal, loading, transportation, weighment, and disposal of debris from private vacant sites to the designated location as notified by bscc

Empanelment of agencies and fixing rate contract on per metric tonne (mt) basis for complete clearing, removal, loading, transportation, weighment, and disposal of debris from private vacant sites to the designated location as notified by bscc

Read more
Routine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year

Routine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year

Read more
Hiring of vehicle tata 207 and 9 ton truck (for transportation of materials incl steel poles upto 13 mtr long) on need basis including driver, fuel, maintenance, insurance, taxes and all other incidental charges as per terms and conditions.

Hiring of vehicle tata 207 and 9 ton truck (for transportation of materials incl steel poles upto 13 mtr long) on need basis including driver, fuel, maintenance, insurance, taxes and all other incidental charges as per terms and conditions.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise