Tender Details

Particulars Details
Title
Rrde System Includes Dc Potentiostat
Description
Organisation Department of Higher Education | Ministry of Education
Tender Id GEM/2023/B/4060989
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date October 14, 2023 00:27
End Date
Expired 03/11/2023

Expired 1073 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

BAT-SOL EQUIPMENTS & TECHNOLOGY

Contract Value

1600080

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 52 Lakhs Experience with Gov. Required: Years
Buyer Name: Seema Shamlal Pardeshi
Ministry: Ministry Of Education
Department: Department Of Higher Education
Organisation: Indian Institute Of Technology (iit)

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 BAT SOL EQUIPMENTS AND TECHNOLOGY Make : PINE AND BAT-SOL Model : WD40-BASIC/AF01WV10 Title : RRDE System includes DC Potentiostat/Galvanostat, Electrode Rotator and Accessories 28-10-2023 12:08:59 MII Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 BAT-SOL EQUIPMENTS & TECHNOLOGY Item Categories : RRDE system includes DC Potentiostat 1600080.00 L1

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
RRDE System includes DC Potentiostat/Galvanostat, Electrode Rotator and Accessories PINE AND BAT-SOL WD40-BASIC/AF01WV10 1 ₹ 1600080.000
Similar Tenders
Tggenco-ktps vii stage/paloncha - supply of air lock realys and 220v dc spare coil

Tggenco-ktps vii stage/paloncha - supply of air lock realys and 220v dc spare coil

Read more
Tggenco-ktps vii stage/paloncha - supply of dc and ac capacitors for 180kva and 130kva hitachi-hirel make ups units

Tggenco-ktps vii stage/paloncha - supply of dc and ac capacitors for 180kva and 130kva hitachi-hirel make ups units

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis

Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis

Read more
Supply, erection, testing and commissioning of lot-i (i) 2nd circuit stringing (28 km) on existing 132kv dc/sc line from 132/33kv ss ayyagaripally to 132/33kv ss nellikuduru (ii) 1no. 132kv bay at ayyagaripally ss and (iii) 1no. 132kv bay at nellikuduru ss in mahabubabad district and lot-ii (i) 2nd circuit stringing (5.2 km) on existing 132kv dc/sc line from 132/33kv ss kamalapur to 132/33kv ss nv puram (ii) 1no. 132kv bay at kamalapur ss (iii) 1no. 132kv bay at nvpuram in mulugu district on tu

Supply, erection, testing and commissioning of lot-i (i) 2nd circuit stringing (28 km) on existing 132kv dc/sc line from 132/33kv ss ayyagaripally to 132/33kv ss nellikuduru (ii) 1no. 132kv bay at ayyagaripally ss and (iii) 1no. 132kv bay at nellikuduru ss in mahabubabad district and lot-ii (i) 2nd circuit stringing (5.2 km) on existing 132kv dc/sc line from 132/33kv ss kamalapur to 132/33kv ss nv puram (ii) 1no. 132kv bay at kamalapur ss (iii) 1no. 132kv bay at nvpuram in mulugu district on turnkey basis.

Read more
Bifurcation of 11kv post office feeder emanating from 33/11kv hps ss by erection of 1 no new 11kv outdoor breaker in the 33/11kv hps ss, which includes laying of 1.4 km of 11kv 3x300 sq.mm of xlpe ug cable (double run in begumpet section of greenlands sub-division of greenlands division and the work executed by the construction wing of banjara hills division of banjara hills circle under t and d improvement works under general category

Bifurcation of 11kv post office feeder emanating from 33/11kv hps ss by erection of 1 no new 11kv outdoor breaker in the 33/11kv hps ss, which includes laying of 1.4 km of 11kv 3x300 sq.mm of xlpe ug cable (double run in begumpet section of greenlands sub-division of greenlands division and the work executed by the construction wing of banjara hills division of banjara hills circle under t and d improvement works under general category

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Em-divn:preventive annual maintenance and servicing of ms chhabi electrical pvt ltd make 220v 850a 220v 570a 220v 40a 220v25 220v 100a and 48v 25a dc chargers located at main plant silo raw water pump house and switchyard as and when required during the year 2026 27

Em-divn:preventive annual maintenance and servicing of ms chhabi electrical pvt ltd make 220v 850a 220v 570a 220v 40a 220v25 220v 100a and 48v 25a dc chargers located at main plant silo raw water pump house and switchyard as and when required during the year 2026 27

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.