Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Co Footsteps From Main Road To Hilal Ahmad Khanday At Gatipora Block Keller
|
| Description |
Co Footsteps From Main Road To Hilal Ahmad Khanday At Gatipora Block Keller
|
| Organisation | Rural Development and Panchayati Raj | State Govt. and UT |
| Tender Id | 2024_PDNRE_14200_1 |
|
Reference Number |
E-NIT NO 69 of 2024-25 |
| Tender Fee | 200 |
| EMD | 0 |
| Tender Value | |
| Place | shopian |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=781043 |
| Start Date | October 17, 2024 16:30 |
| End Date |
Expired
23/10/2024
Expired 607 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Onstruction of an interlocking road from the shikarpur main road to neeru plot in village bagrai, block arniya
Onstruction of an interlocking road from the shikarpur main road to neeru plot in village bagrai, block arniya
Read moreConstruction of odc road from new b and p chambers to main road
Construction of odc road from new b and p chambers to main road
Read moreConstruction of nallah from mangal murti plaza to main road. 2509
Construction of nallah from mangal murti plaza to main road. 2509
Read moreEtender for replacement of old damage cable from main academic block to nursing hostel urc goindwal
Etender for replacement of old damage cable from main academic block to nursing hostel urc goindwal
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreShifting/dismantling of electrical lines which are creating hurdles in road widening from nandpuri underpass (80 ft road) to main road (100 ft), zone-c, jaipur
Shifting/dismantling of electrical lines which are creating hurdles in road widening from nandpuri underpass (80 ft road) to main road (100 ft), zone-c, jaipur
Read moreDesilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)
Desilting of drain from amrit vihar to shalimar palace on main burari road and swaroop nagar road due to sand deposition into pwd drain by djb. (3rd call)
Read moreDevelopment of main road leading to sector 12 including main of lane 5 at hamdaniya colony bwo p/l of nallah muck/ khak bajri and wbm grade 2nd
Development of main road leading to sector 12 including main of lane 5 at hamdaniya colony bwo p/l of nallah muck/ khak bajri and wbm grade 2nd
Read moreConstruction of bypass from jaitpura to jaisinghpura at sikar road
Construction of bypass from jaitpura to jaisinghpura at sikar road
Read moreProvn of toilet block at 9 rajput and boundary wall with main gate at ecib at tezu under ge (p) lohitpur
Provn of toilet block at 9 rajput and boundary wall with main gate at ecib at tezu under ge (p) lohitpur
Read moreof your Industry type