Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Supply And Fitting Of Gang Operating Switch And Cradle Guard Of 3.3 K V Overhead Line And Maintenance Of 220 V, 440 V, 3.3 Kv And 6.6 Kv Ohl At Khottadih Ocp.
|
Description |
Dismantling, Supply And Fitting Of Gang Operating Switch And Cradle Guard Of 3.3 K V Overhead Line And Maintenance Of 220 V, 440 V, 3.3 Kv And 6.6 Kv Ohl At Khottadih Ocp.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_331449_1 |
Reference Number |
GM-PND/EandM/24-25/252/1310 dated 05/03/2025 |
Tender Fee | 0 |
EMD | 17700 |
Tender Value | |
Place | Khottadih OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343573 |
Start Date | March 07, 2025 14:30 |
End Date |
17/03/2025 ( Expired 60 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, erection, testing and commissioning of 220 kv 2nd burnpur s/c lilo line from 220 kv kalyaneswari-mejia (l#240) line as part of power supply augmentation scheme of isp
Supply, erection, testing and commissioning of 220 kv 2nd burnpur s/c lilo line from 220 kv kalyaneswari-mejia (l#240) line as part of power supply augmentation scheme of isp
Read moreSupply, installation, testing and commissioning of lp air compressor including lp air pipe line at nd(v)
Supply, installation, testing and commissioning of lp air compressor including lp air pipe line at nd(v)
Read moreConstruction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Read moreStage/rate contract for supply of key material/ equipments required for operation/maintenance of 33kv lines and 33/11-6.6 kv receiving stations valid for the financial year 202-6 or till finalization of next stage contract
Stage/rate contract for supply of key material/ equipments required for operation/maintenance of 33kv lines and 33/11-6.6 kv receiving stations valid for the financial year 202-6 or till finalization of next stage contract
Read moreRepair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at l line at bakloh cantt
Repair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at l line at bakloh cantt
Read moreSupply and refilling work of sf6 gas cylinder at various 400/220/132 kv sub station under electricity transmission circle banda.
Supply and refilling work of sf6 gas cylinder at various 400/220/132 kv sub station under electricity transmission circle banda.
Read moreWork of strenghthening of existing 220 kv and 132 kv main bus along with supply of material and associated works at 220 kv sub station banda under etd banda.
Work of strenghthening of existing 220 kv and 132 kv main bus along with supply of material and associated works at 220 kv sub station banda under etd banda.
Read moreRepair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at t line at bakloh cantt
Repair and maintenance of us lt cables lt panels lt switch gear protection system oh lines and other connected work at t line at bakloh cantt
Read moreCa no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Ca no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Read moreMaintenance, necessary line shifting, extensions and upgradation of existing/upcoming 6.6 kv feeders emanating from hingula 33 kv/6.6 kv substation for a period of 730 days.
Maintenance, necessary line shifting, extensions and upgradation of existing/upcoming 6.6 kv feeders emanating from hingula 33 kv/6.6 kv substation for a period of 730 days.
Read moreof your Industry type