Tender Details

Particulars Details
Title
Repairing/ Strengthening Of Walkway, Platform For Both Walkway And Non Walkway Sides Of Unit 801 A Conveyor Belt Up To 75 Mtr. Length From Head End At Moonidih Coal Washery.
Description
Repairing/ Strengthening Of Walkway, Platform For Both Walkway And Non Walkway Sides Of Unit 801 A Conveyor Belt Up To 75 Mtr. Length From Head End At Moonidih Coal Washery.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_327480_1
Reference
Number
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1510
Tender Fee 0
EMD 8600
Tender Value
Place MOONIDIH WASHERY
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339428
Start Date February 01, 2025 14:30
End Date

10/02/2025 ( Expired 97 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.

Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.

Read more
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.

Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.

Read more
Making and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.

Making and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.

Read more
Mtps i bm unit i aoh 2025 26 strengthening of the eroded portions of esp hopper fg duct from esp outlet to chimney and other related works in both a and b sides

Mtps i bm unit i aoh 2025 26 strengthening of the eroded portions of esp hopper fg duct from esp outlet to chimney and other related works in both a and b sides

Read more
Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.

Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.

Read more
The work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd

The work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd

Read more
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project

Carriage of spillaged coal from the raw coal section by manual labor including loading unloading &#x0d and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project

Read more
Interlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.

Interlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.

Read more
Work of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl

Work of providing &amp#x0d consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal &amp#x0d mines of wcl withing 40 km to stps, mppgcl

Read more
Strengthening of conveyor 17 for a length of 400 metre and conveyor 14 for a length of 250 metre from tail end

Strengthening of conveyor 17 for a length of 400 metre and conveyor 14 for a length of 250 metre from tail end

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise