Tender Details

Particulars Details
Title
Construction Of Remaining Civil Works Of Trout Hatchery At Bageshwar
Description
Construction Of Remaining Civil Works Of Trout Hatchery At Bageshwar
Organisation Government of Uttarkhand
Tender Id 2023_MDPEY_66687_1
Reference
Number
01/Camp Dehradun/ Dated 18/12/2023
Tender Fee 3540
EMD 1.48 Lakh
Tender Value -
Place PM CONSTRUCTION UNIT UKPJN RANIKHET
Link
View Original Tender Notice

https://uktenders.gov.in

Start Date December 23, 2023 15:30
End Date
Expired 03/01/2024

Expired 998 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of commercial complex building at rapcms ltd yard in mandya

Construction of commercial complex building at rapcms ltd yard in mandya

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district

Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district

Read more
Construction of additional class rooms to mini gurukulam at mamda (v) of mamda (m) in nirmal district

Construction of additional class rooms to mini gurukulam at mamda (v) of mamda (m) in nirmal district

Read more
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy

Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy

Read more
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.

Read more
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.

Read more
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Read more
Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.

Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise