Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication, Modification, Scaffolding And Erection Of Ss And Cs Piping Spools For Sodium And Water Systems In Frtg
|
| Description |
Fabrication, Modification, Scaffolding And Erection Of Ss And Cs Piping Spools For Sodium And Water Systems In Frtg As Per Tender Document
|
| Organisation | Indira Gandhi Centre for Atomic Research | Central Govt. Ministry/Department |
| Tender Id | 2025_IGCAR_874555_1 |
|
Reference Number |
IGC/FRTG/DDRSD/MSS/DL/2025 |
| Tender Fee | 0 |
| EMD | 92000 |
| Tender Value | - |
| Place | FRTG |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=919833 |
| Start Date | September 12, 2025 15:30 |
| End Date |
Expired
24/09/2025
Expired 387 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - piping work non ibr (cs & ss)
Custom bid for services - piping work non ibr (cs & ss)
Read moreMilk and curd processing, packing systems and ss pipeline revamping, including repair, servicing, modification, installation and commissioning at warangal dairy
Milk and curd processing, packing systems and ss pipeline revamping, including repair, servicing, modification, installation and commissioning at warangal dairy
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit providing support services for maintenance of fuel handling equipment (including temporary staging, piping modifications, painting and fabrication) at pfb..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit providing support services for maintenance of fuel handling equipment (including temporary staging, piping modifications, painting and fabrication) at pfb..
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit assistance for installation of 100 mt liquid co2 tank along with fabrication erection of ss pipelines structural platforms in liquid co2 plant at rcf trom..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit assistance for installation of 100 mt liquid co2 tank along with fabrication erection of ss pipelines structural platforms in liquid co2 plant at rcf trom..
Read moreSitc of 4.0 kw jockey pump with motor,sitc of automatic fire pump control panel for 4 pumps,sitc of pressure gauge,sitc of ul fm approved pressure switch,refixing, tc of existing air vessel,sitc of double flanged sluice valves pn 16,sitc of swing check nrv pn 16,sitc of cast iron bucket type strainer 80 mm,sitc of gear-operated dual plate nrv 80 mm pn 16,sitc of lockable butterfly valves pn 16,sitc of class-c heavy-duty ms fire hydrant piping,fabrication, installation of structural steel supports,sitc of pressure relief valve with delivery header,sitc of single-headed stainless-steel landing valve,sitc of double-headed stainless-steel landing valve,sitc of stainless-steel branch pipe with gun metal nozzle,sitc of 5x type low expansion foam branch,sitc of nfpa 1964 compliant jet fire nozzle,sitc of rrl fire hose with couplings,sitc of first aid hose reel with 30 m tph,sitc of automatic air release valve 25 mm,sitc of brass ball valve 25 mm,modification extension of existing fh piping,sitc of gi earthing strip
Sitc of 4.0 kw jockey pump with motor,sitc of automatic fire pump control panel for 4 pumps,sitc of pressure gauge,sitc of ul fm approved pressure switch,refixing, tc of existing air vessel,sitc of double flanged sluice valves pn 16,sitc of swing check nrv pn 16,sitc of cast iron bucket type strainer 80 mm,sitc of gear-operated dual plate nrv 80 mm pn 16,sitc of lockable butterfly valves pn 16,sitc of class-c heavy-duty ms fire hydrant piping,fabrication, installation of structural steel supports,sitc of pressure relief valve with delivery header,sitc of single-headed stainless-steel landing valve,sitc of double-headed stainless-steel landing valve,sitc of stainless-steel branch pipe with gun metal nozzle,sitc of 5x type low expansion foam branch,sitc of nfpa 1964 compliant jet fire nozzle,sitc of rrl fire hose with couplings,sitc of first aid hose reel with 30 m tph,sitc of automatic air release valve 25 mm,sitc of brass ball valve 25 mm,modification extension of existing fh piping,sitc of gi earthing strip
Read moreMaintenance of general and sodium instrumentation systems in frtg, igcar
Maintenance of general and sodium instrumentation systems in frtg, igcar
Read moreCs or ss piping fabrication works at recovery unit of heavy water plant manuguru
Cs/ss piping fabrication works in h2s generation and na2so4 recovery unit areas at main plant of hwpm
Read moreSodium loops modification, erection of stainless steel piping, and also existing sodium loops emergency repair and maintenance work in sodium wetted stainless steel piping works in engineering hall-3, engineering hall-5 and engineering hall-1 at frtg
Sodium loops modification, erection of stainless steel piping, and also existing sodium loops emergency repair and maintenance work in sodium wetted stainless steel piping works in engineering hall-3, engineering hall-5 and engineering hall-1 at frtg
Read moreof your Industry type