Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps I Se M Ii Circle Echs Dn Erection And Commissioning Along With Material Of Railway Track Points And Crossing 1 No Point No 122 At Nctps I Siding
|
| Description |
Nctps I Se M Ii Circle Echs Dn Erection And Commissioning Along With Material Of Railway Track Points And Crossing 1 No Point No 122 At Nctps I Siding
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_584949_1 |
|
Reference Number |
CE/NCTPSI/SE/MII/SpNo78/25-26 |
| Tender Fee | 0 |
| EMD | 31550 |
| Tender Value | - |
| Place | NCTPS-I Chennai |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=698845 |
| Start Date | July 23, 2025 23:30 |
| End Date |
Expired
06/08/2025
Expired 431 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.
Tggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreNctps i se m ii circle echs dn supply erection and commissioning of railway track points and crossing 2 nos point no 136 and 138 in nctps i siding
Nctps i se m ii circle echs dn supply erection and commissioning of railway track points and crossing 2 nos point no 136 and 138 in nctps i siding
Read moreNctps i semii circle echs dn nctps aip railway siding recoupment of ballast in the deficiency area of 8th 9th track line inside nctps siding track by dumping spreading and deep screening of ballast
Nctps i semii circle echs dn nctps aip railway siding recoupment of ballast in the deficiency area of 8th 9th track line inside nctps siding track by dumping spreading and deep screening of ballast
Read moreEchs dn nctps aip railway siding daily maintenance and prive breakdown works
Echs dn nctps aip railway siding daily maintenance and prive breakdown works
Read moreEchs dn nctps aip railway siding daily maintenance and preventive breakdown works of tracks and electronic in motion weigh bridge eimwb at track no8
Echs dn nctps aip railway siding daily maintenance and preventive breakdown works of tracks and electronic in motion weigh bridge eimwb at track no8
Read moreechs dn nctps aip railway siding daily maintenance and preventive breakdown works of tracks and electronic in motion
Echs dn nctps aip railway siding daily maintenance and preventive breakdown works of tracks and electronic in motion weigh bridge eimwb at track no 8 and relevant equipment s through private agency for the period of six months
Read moreNctps i se mii circle echs dn aip siding m s kpl released railway track materials during upgradation of nctps i tracks leading lifting stacking and transportation of psc concrete sleepers and other accessories from m s kpl to nctps-i
Nctps i se mii circle echs dn aip siding m s kpl released railway track materials during upgradation of nctps i tracks leading lifting stacking and transportation of psc concrete sleepers and other accessories from m s kpl to nctps-i
Read moreNctps i mii circle echs dn nctps siding track complete renewal of existing worn out crossing 1 8 1/2 inch and fittings with new version of cms crossing tongue rail with psc concrete sleepers and fittings and widening of formation in point no129
Nctps i m ii circle echs dn nctps siding track complete renewal of existing worn out crossing 1 8 1/2 inch and fittings with new version of cms crossing tongue rail with psc concrete sleepers and fittings and widening of formation in point no129
Read moreof your Industry type