Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Erection Of New E Seva Kendram At Munsiff Magistrate Court Thamarassery Construction Of New E Seva Kendram And Yard Paving At Munsiff Magistrate Court Thamarassery General Electrical Work
|
| Description |
General Erection Of New E Seva Kendram At Munsiff Magistrate Court Thamarassery Construction Of New E Seva Kendram And Yard Paving At Munsiff Magistrate Court Thamarassery General Electrical Work
|
| Organisation | PWD | Chief Engineer (Buildings) | SE (Electrical) | EE Elect (KKD) | Electrical Sub Division Kozhikkode |
| Tender Id | 2026_PWD_870618_2 |
|
Reference Number |
PWD/BLDG/TR/10372/2026 |
| Tender Fee | 555 |
| EMD | 2097 |
| Tender Value | 83870 |
| Place | Kerala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=Home&service=page |
| Start Date | October 07, 2026 23:30 |
| End Date |
Expired
14/10/2026
Expired 3 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Urgent special repair work to munsiff magistrate court quarters sulthan bathery court complex
Urgent special repair work to munsiff magistrate court quarters sulthan bathery court complex
Read moreProvision for e-seva centre in first floor for combined court campus in tiruppur district.
Provision for e-seva centre in first floor for combined court campus in tiruppur district.
Read moreProvision for e-seva centre in ground floor for combined court campus in tiruppur district
Provision for e-seva centre in ground floor for combined court campus in tiruppur district
Read moreDeposit-sitc of 1 tr air conditioner in server room at munsiff court kannur.-sitc of 1 tr ac-general electrical work
Deposit-sitc of 1 tr air conditioner in server room at munsiff court kannur.-sitc of 1 tr ac-general electrical work
Read moreBadminton court clearance,concrete flooring up to 10 cm in court yard in radio 1 2 4,pcc flooring up to 10 cm in court yard in radio 1 6 12,court line marking,led light with pole 1500 watt,synthetic paint 7 layer,badminton net with moveable pole stand
Badminton court clearance,concrete flooring up to 10 cm in court yard in radio 1 2 4,pcc flooring up to 10 cm in court yard in radio 1 6 12,court line marking,led light with pole 1500 watt,synthetic paint 7 layer,badminton net with moveable pole stand
Read moreDesign, supply, erection, testing & commissioning of 50hz, single phase 25 kv ac ohe in c/w provision of shower testing facility at kjgy yard.
Design, supply, erection, testing & commissioning of 50hz, single phase 25 kv ac ohe in c/w provision of shower testing facility at kjgy yard.
Read moreDesign, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway
Design, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway
Read moreSupply, delivery, erection,testing,installation and commissioning including modification of electronic inter-locking (ei) system with signalling and tele-communication (s and t) and other allied works etc. at prayagraj (allahabad)yard .....
..( continue from above ) for connection of rail flyover (phase-ii) with 4th line in connection with construction of rfo-2 under n.c.rly, ministry of raily, govt. of india.
Read moreDesign, drawing, supply, erection, testing and commissioning of balance ohe works at koteganguru yard in connection with development of coaching depot at koteganguru in mysuru division, south western railway, india including modification to existing
As per tender
Read moreDesign, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Design, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Read moreof your Industry type