Tender Details

Particulars Details
Title
Dismantling ,Shifting And Re Erection Of 16 Mtr High Mast Tower Along With Repair Of Existing High Mast Tower At Various Locations For Mines Expansion At Different Places Of Lingaraj Ocp, Lingaraj Area
Description
Dismantling ,Shifting And Re Erection Of 16 Mtr High Mast Tower Along With Repair Of Existing High Mast Tower At Various Locations For Mines Expansion At Different Places Of Lingaraj Ocp, Lingaraj Area
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 17200
Tender Value
Place LINGARAJ OCP
Link

AAAAAAAAAA

Login to view
Start Date April 22, 2025 15:30
End Date

02/05/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur

Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur

Read more
Design engineering supply erection t and c for height raising of tower between loc no 76 - 77 and 115 - 116 of 220 kv latehar-itkhori tl including dismantling and transportation of existing towers with accessories to nearest jusnl store on turnkey ba

Design engineering supply erection t and c for height raising of tower between loc no 76 - 77 and 115 - 116 of 220 kv latehar-itkhori tl including dismantling and transportation of existing towers with accessories to nearest jusnl store on turnkey ba

Read more
Dismantling ,shifting and re-erection of 16 mtr high mast tower along with repair of existing high mast tower at various locations for mines expansion at different places of lingaraj ocp, lingaraj area

Dismantling ,shifting and re-erection of 16 mtr high mast tower along with repair of existing high mast tower at various locations for mines expansion at different places of lingaraj ocp, lingaraj area

Read more
Repairing, maintenance, dismantling, shifting and re erection of high mast towers in north and south quarry, ilbl ocp, lakhanpur area, mcl

Repairing, maintenance, dismantling, shifting and re erection of high mast towers in north and south quarry, ilbl ocp, lakhanpur area, mcl

Read more
Repair and maintenance of rain water harvesting system at different locations under amrapali ocp of a-c area, ccl

Repair and maintenance of rain water harvesting system at different locations under amrapali ocp of a-c area, ccl

Read more
Design, manufacture, supply, erection, testing and commissioning of 500 kva distribution transformers

Design, manufacture, supply, erection, testing and commissioning of 500 kva distribution transformers after dismantling the existing transformers at different locations under electrical circle, alappuzha on turnkey basis

Read more
Design, manufacture, supply, erection, testing and commissioning of 250 kva distribution transformers

Design, manufacture, supply, erection, testing and commissioning of 250 kva distribution transformers after dismantling the existing transformers at different locations under electrical circle, alappuzha on turnkey basis

Read more
Special repair to replacement of control panels along with connected items of lifts installed at various locations under ge (u) pm delhi cantt - 10

Special repair to replacement of control panels along with connected items of lifts installed at various locations under ge (u) pm delhi cantt - 10

Read more
Repair/maint of u/g cable earthings of electric insatllations , db box,street light poles, high mast poles along with allied works at aec trg college and centre pachmarhi

Repair/maint of u/g cable earthings of electric insatllations , db box,street light poles, high mast poles along with allied works at aec trg college and centre pachmarhi

Read more
Labour charges for re-organization of pipelines by shifting/re-laying of existing pipelines for a period of 2 years at gkoc/vkcm, kothagudem area

Labour charges for re-organization of pipelines by shifting/re-laying of existing pipelines for a period of 2 years at gkoc/vkcm, kothagudem area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise