Tender Details
Particulars | Details |
---|---|
Title |
Repair Work In Flat No. C 46, Reids Line Colony, University Of Delhi
|
Description |
Repair Work In Flat No. C 46, Reids Line Colony, University Of Delhi
|
Organisation | Delhi University | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 5280 |
Tender Value | |
Place | North Campus |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 23:30 |
End Date |
05/06/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreSelection of service provider for himachal pradesh rajya chayan aayog hprca hamirpur to conduct computer based tests cbt for selection of group c posts in himachal pradesh
Selection of service provider for himachal pradesh rajya chayan aayog hprca hamirpur to conduct computer based tests cbt for selection of group c posts in himachal pradesh
Read moreConstruction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.
Construction of non-residential building of tehsil bhatwari, damaged due to disaster in district uttarkashi under c.m announcement no. 37/2017.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreof your Industry type