Tender Details

Particulars Details
Title
Rmo Elect. And Mech. Services At Dr. Bhim Rao Ambedkar College Wazirabad Road Delhi. (Sh Replacement Of Cable Work)
Description
Rmo Elect. And Mech. Services At Dr. Bhim Rao Ambedkar College Wazirabad Road Delhi. (Sh Replacement Of Cable Work)
Organisation Public Works Department | State Govt. and UT
Tender Id 2025_PWD_269399_1
Reference
Number
131/EE (E)/PWD NE and Shah. Elect. Divn./2024-25
Tender Fee 0
EMD 15789
Tender Value
Place BR Ambedkar College
Link https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353459
Start Date March 10, 2025 22:30
End Date

19/03/2025 ( Expired 54 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Read more
Construction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.

Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.

Read more
Upgradation of rural road from sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay

Upgradation of rural road form sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb23, length 1.372 km)

Read more
Special repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10

Special repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.

Read more
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

Read more
Construction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii

Construction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise