Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling, Loading, Unloading, Laying Of Track Line Its Accessories And Dismantling, Loading, Unloading, Transportation Of Pvc Belt And Its Accessories From 25 Lw Panel Then Installation In Proposed Depillaring Panel 40 Le.
|
Description |
Dismantling, Loading, Unloading, Laying Of Track Line Its Accessories And Dismantling, Loading, Unloading, Transportation Of Pvc Belt And Its Accessories From 25 Lw Panel Then Installation In Proposed Depillaring Panel 40 Le.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_334043_1 |
Reference Number |
SECL/JK/GM(O)/25-26/eT/03 Date 11.04.2025 |
Tender Fee | 0 |
EMD | 42400 |
Tender Value | |
Place | Bartarai Colliery, Amadand UG Sub Area, JK Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346275 |
Start Date | April 12, 2025 23:00 |
End Date |
23/04/2025 ( Expired 69 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreCleaning, collection and transportation of spilled coal and coal dust from horizontal belt, big inclines belt, engine room and different chutes of gas plant to coal yard for unloading
Cleaning, collection and transportation of spilled coal and coal dust from horizontal belt, big inclines belt, engine room and different chutes of gas plant to coal yard for unloading
Read moreLaying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Laying new drainage line in place of damaged drainage line from councillor fund in nehru nagar road no. 03 and 04 under zone no. 09 ward no. 26 in ghanshyam verma, shiv gogde and kamala tent back line in road no. 04 and 05.
Read moreLaying a new drainage line from councillors fund in place of the damaged drainage line from pappu bhatia jis wooden stall to central bank and in the surrounding lanes under zone number 09 ward number 47.
Laying a new drainage line from councillors fund in place of the damaged drainage line from pappu bhatia jis wooden stall to central bank and in the surrounding lanes under zone number 09 ward number 47.
Read moreConstruction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Construction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Read moreNotice inviting tender for the engagement of a packing and moving agency for dismantling, packing, loading, shifting, unloading, unpacking, placing, and fixing of science laboratory equipment and chemicals from central university of gujarat, sector 3
Notice inviting tender for the engagement of a packing and moving agency for dismantling, packing, loading, shifting, unloading, unpacking, placing, and fixing of science laboratory equipment and chemicals from central university of gujarat, sector 3
Read moreSupply, installation, testing and commissioning of 33kv 2 nos. bay at 132kv ss natrip, pithampur and 33kv dcds line from 132kv ss natrip to proposed 33 11kv ss sector-6, pithampur, distt. dhar m.p.
Supply, installation, testing and commissioning of 33kv 2 nos. bay at 132kv ss natrip, pithampur and 33kv dcds line from 132kv ss natrip to proposed 33 11kv ss sector-6, pithampur, distt. dhar m.p.
Read moreTransportation charge and loading, unloading of fruit plants from ayeshpur, farm to different blocks in different districts of west bengal
Transportation charge and loading, unloading of fruit plants from ayeshpur, farm to different blocks in different districts of west bengal
Read moreProviding and laying of 225mm od and 160mm od hdpe pipeline from kamraj nagar oht to bird line junction at bird line, ward no. 23 and from range office (direct line) to mariamma temple in austinabad, ward no. 20
Providing and laying of 225mm od and 160mm od hdpe pipeline from kamraj nagar oht to bird line junction at bird line, ward no. 23 and from range office (direct line) to mariamma temple in austinabad, ward no. 20
Read moreProviding and laying of 225mm and 160mm dia hdpe pipeline loading line from satellite qtrs tank to new pahar gaon tank and from range office (cable line) to mariamma temple in austinabad, ward no. 20
Providing and laying of 225mm and 160mm dia hdpe pipeline loading line from satellite qtrs tank to new pahar gaon tank and from range office (cable line) to mariamma temple in austinabad, ward no. 20
Read moreof your Industry type