Tender Details

Particulars Details
Title
General Pvip Action Plan 2024 2025 Annual Maintenance Clearing Blockages In Syphon, Culvert, Cut And Cover Etc In Link Canal, Kizhakkambalam Branch Canal And Its Distributaries , Poothrikka Md And Its Distributories, Vadayambady Md, Pariyaram Md A
Description
The Items Included In The Estimate Are Engaging Coolies, Clearing Earth(slipped And Deposited By Canal Water) And Clearing The Water Weeds, Concrete For Patch Work During Water Distribution, Cutting Trees In Emergency Situation Etc.
Organisation Irrigation Department | State Govt. and UT
Tender Id 2024_Irrig_700113_1
Reference
Number
IRR/PII/TR/2525/2024_5_15_14/1
Tender Fee 750
EMD 8455
Tender Value
Place LKolenchery
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093465
Start Date October 26, 2024 22:30
End Date

04/11/2024 ( Expired 238 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Wbnkda/04/ee(wd and s)/nkda of 2025-26 (2nd call) sl no 01

Clearing and removal of jungles, bushes, water hyacinths etc. from the canal bed and slope of a ghuni canal in action area ii under nkda, new town, kolkata (for a period of 365 days).

Read more
General-psm 2025-26-monsoon preparedness -rbmc and branch canalsremoval of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition for the year 2025-26 -general civil work

General-psm 2025-26-monsoonpreparedness -rbmc and branch canalsremoval of slipped earth, clearing of canal&amp#x0d block during heavy rain, cutting and removal of&amp#x0d falling trees and trees are in dangerous&amp#x0d condition for the year 2025-26&amp#x0d -general civil work

Read more
General-psm 2025-26-monsoon preparedness -lbmc and branch canalsremoval of slipped earth, clearing of canal/river block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition.-general civil work

General-psm 2025-26-monsoon&amp#x0d preparedness -lbmc and branch canalsremoval of slipped earth, clearing of&amp#x0d canal/river block during heavy rain, cutting&amp#x0d and removal of falling trees and trees are in&amp#x0d dangerous condition.-general civil work

Read more
Wbnkda/05/ee-(wd and s)/nkda of 2025-26 (sl no 03)

Clearing and removal of jungles, bushes, water hyacinths etc. from the canal bed and slope of g canal in action area i under nkda, new town, kolkata (for a period of 365 days).

Read more
General-annual projects 2024-25- project no 22/25 maitenance and renovation of karingazha m tex road different branch roads in o l i m a l a m i n i p a d i r o a d librarypady pvip canal link road shilpi road manekkavu pvip canal bund road

General-annual projects 2024-25-&amp#x0d project no 22/25 maitenance and&amp#x0d renovation of karingazha m tex&amp#x0d road different branch roads in&amp#x0d o l i m a l a m i n i p a d i r o a d&amp#x0d librarypady pvip canal link road&amp#x0d shilpi road manekkavu pvip canal&amp#x0d bund road

Read more
Annual plan-project no 242/25-culvert ,drain cover slab and road concreting in m .a bank and m. a bank janatha road in ward 1 - general civil work-cheranelloor gp 2024-25

Annual plan-project no 242/25-culvert ,drain&amp#x0d cover slab and road concreting in m .a bank&amp#x0d and m. a bank janatha road in ward 1 -&amp#x0d general civil work-cheranelloor gp 2024-25

Read more
General action plan 2024 25 kip o and m rectification works of sasthamcotta branch canal between ch 9500m to 9700 m and between ch 10300 m to 10800m in erathu panchayath inorder to pr the seepage during water distribution general civil work

General action plan 2024 25 kip o and m rectification works of sasthamcotta branch canal between ch 9500m to 9700 m and between ch 10300 m to 10800m in erathu panchayath inorder to pr the seepage during water distribution general civil work

Read more
General kip o andp m section 7 2 kalanjoor annual maintanance of canals action plan sanctioned works 2024 2025 konni distributory from ch 0m to 22125m vazhamuttom distributory from ch 0m to 4274m and mallassery distributory from 0m to 984m in connect

General kip o andp m section 7 2 kalanjoor annual maintanance of canals action plan sanctioned works 2024 2025 konni distributory from ch 0m to 22125m vazhamuttom distributory from ch 0m to 4274m and mallassery distributory from 0m to 984m in connect

Read more
General-kyip acp(np) 2024-25-clearing jungle and desilting of kakkodi branch canal b/w ch 23/000 km and 26/000 km and distributories and fbs coming from it and 8/2 syphon-general civil work

General-kyip acp(np) 2024-25-clearing&amp#x0d jungle and desilting of kakkodi branch canal&amp#x0d b/w ch 23/000 km and 26/000 km and&amp#x0d distributories and fbs coming from it&amp#x0d and 8/2 syphon-general civil work

Read more
General-pvip-annual maintenance of thuruthikkara md from ch.0/000km to tail end for the year 2024-25-general civil work

The provisions included in the estimate are 1.clearing grass , 2.earthwork excavation fo removing silt from canal bed.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise