Tender Details

Particulars Details
Title
Construction Of Side Protection Wall To The Right Side Of Nallah Bank Near Sneha Mandir In V.P. Bandora In Marcaim Constituency.
Description
Construction Of Side Protection Wall To The Right Side Of Nallah Bank Near Sneha Mandir In V.P. Bandora In Marcaim Constituency.
Organisation WATER RESOURCE DEPARTMENT | State Govt. and UT
Tender Id 2025_WRD_20654_1
Reference
Number
WDXI/PB/F.24/2024-25/1700/Sr1
Tender Fee 14000
EMD 1.78 Lakh
Tender Value
Place Ravonfond, Navelim
Link https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=21084
Start Date March 18, 2025 23:30
End Date

21/04/2025 ( Expired 63 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Read more
Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh

Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh

Read more
Construction work of cc drain in ward number 6 from pramod bairagi house to behind the bus stand, near gillu kabade in the street opposite shiv madia and at other places.

Construction work of cc drain in ward number 6 from pramod bairagi house to behind the bus stand, near gillu kabade in the street opposite shiv madia and at other places.

Read more
Construction of p.c.c. road from main road to khermai mandir in ram ward, nagar palika parishad, panagar

Construction of p.c.c. road from main road to khermai mandir in ram ward, nagar palika parishad, panagar

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of bituminous road

Construction of bituminous road from devta ka bagicha( lodhi mohalla) to vaishno mata mandir in ward no 07

Read more
Construction of straight-cut flood escape channel from south buckingham canal near okkiyam maduvu to sea in chennai district for flood relief to fringe areas around pallikaranai swamp.

Construction of straight-cut flood escape channel from south buckingham canal near okkiyam maduvu to sea in chennai district for flood relief to fringe areas around pallikaranai swamp.

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise