Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Specification For Designing, Construction, Fabrication, Erection, Testing And Commissioning Of (Foam) Fire Tender On 19 Ton Gvw Bs Vi Tata/ Ashok Leyland/ Eqivalent Chassis 1
|
Description |
Specification For Designing, Construction, Fabrication, Erection, Testing And Commissioning Of (Foam) Fire Tender On 19 Ton Gvw Bs Vi Tata/ Ashok Leyland/ Eqivalent Chassis 1
|
Organisation | Directorate Of Municipal Administration | State Govt. and UT |
Tender Id | 2024_DMA_986025_1 |
Reference Number |
02/MHK |
Tender Fee | 5500 |
EMD | 1.59 Lakh |
Tender Value | |
Place | Municipal Council Mehkar |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1948857 |
Start Date | October 14, 2024 22:15 |
End Date |
22/10/2024 ( Expired 255 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines
Read moreDesign, construction, testing, commissioning and operation and maintenance of internal infrastructure works for pm mitra park dhar (mp) package i on epc basis
Design, construction, testing, commissioning and operation and maintenance of internal infrastructure works for pm mitra park dhar (mp) package i on epc basis
Read moreDesign, survey, engg, constr., supply, erection, testing and commissioning of 12 mld sewerage treatment plant cum water reclamation facility at tech zone it city, gr. noida based on sbr technology including o and m for 120 months.
Design, survey, engg, constr., supply, erection, testing and commissioning of 12 mld sewerage treatment plant cum water reclamation facility at tech zone it city, gr. noida based on sbr technology including o and m for 120 months.
Read moreDesign supply erection and commissioning of automatic fire detection and quenching system with bypass circuit at ground floor for conveyor 11a and 11b at bunker top 1 set
Design supply erection and commissioning of automatic fire detection and quenching system with bypass circuit at ground floor for conveyor 11a and 11b at bunker top 1 set
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Read moreSupply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu
Read moreSupply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at bhagata mohalla , damuni, under ed-i jammu
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at bhagata mohalla , damuni, under ed-i jammu
Read moreDesign fabrication supply installation testing and commissioning of false key arrangements for control valves installed on water mains in h and k wards under ae maint ww ws south division
Design fabrication supply installation testing and commissioning of false key arrangements for control valves installed on water mains in h and k wards under ae maint ww ws south division
Read moreRate contract for supply, erection, testing, commissioning for laying of lt line on 50mmsq, 70mmsq, 95mmsq and 120mmsq lt ab cable on 8/9 m pcc poles and st poles under ed-i for fy 2025-26 on turnkey basis
Rate contract for supply, erection, testing, commissioning for laying of lt line on 50mmsq, 70mmsq, 95mmsq and 120mmsq lt ab cable on 8/9 m pcc poles and st poles under ed-i for fy 2025-26 on turnkey basis
Read moreof your Industry type