Tender Details

About Tender

🏗️ Construction Opportunity: Modular Steel Bridge Abutments 🌉 The Dte General Border Roads Organisation, Under The Central Government, Invites Tenders For The Construction Of Sub Structure Abutments For A 200 Feet Single Lane Modular Galvanized Steel Bridge At Km 85.130 On The Gangtok Chungthang Road. 🛠️ 📅 Bid Submission Deadline: June 3, 2024, 12:00 Pm The Project Involves Executing All Items Of Work Required For Launching The Bridge As Per The Approved Bridge Scheme And Drawings. Interested Contractors Must Submit An Earnest Money Deposit (Emd) Of Inr 17,14,15 And Adhere To The Tender Documentation And Guidelines Provided. Keywords: Construction, Modular Galvanized Steel Bridge, Abutments, Border Roads Organisation, Central Government, Tender, Emd, Bridge Construction, Infrastructure Project
Particulars Details
Title
Construction Of Sub Structure Abutments As Per Drawings For 200 Feet Single Lane Modular Galvanized Steel Bridge At Km 85.130 On Gangtok Chungthang Road As Per Approved Bridge Scheme And Drawings By Executing All Items Of Works Required For Launchin
Description
Construction Of Sub Structure Abutments As Per Drawings For 200 Feet Single Lane Modular Galvanized Steel Bridge At Km 85.130 On Gangtok Chungthang Road As Per Approved Bridge Scheme And Drawings By Executing All Items Of Works Required For Launchin
Organisation Dte General Border Roads Organisation | Central Govt. Ministry/Department
Tender Id 2024_BRO_652838_1
Reference
Number
80579
Tender Fee 0
EMD 1.71 Lakh
Tender Value
Place At KM 85.130 on GC Road
Link https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=730735
Start Date May 13, 2024 19:30
End Date

03/06/2024 ( Expired 368 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of sub structure (abutments) including approaches with permanent works on open foundation over teesta river for 230 feet single lane modular steel bridge (to be constructed by other agency) at km 6.240 on mangan-sanklang road under 107 r

Construction of sub structure (abutments) including approaches with permanent works on open foundation over teesta river for 230 feet single lane modular steel bridge (to be constructed by other agency) at km 6.240 on mangan-sanklang road under 107 r

Read more
Construction of sub structure (abutments) including approaches with permanent works including design and drawings of abutments (duly proof checked) on open foundation over teesta river for 230 feet single lane modular steel bridge (to be constructed

Construction of sub structure (abutments) including approaches with permanent works including design and drawings of abutments (duly proof checked) on open foundation over teesta river for 230 feet single lane modular steel bridge (to be constructed

Read more
Construction of sub structure (abutments) as per drawings provided for double lane modular bridge ( to be constructed by other agency) at km 18.200, km 19.00, km 23.270 and km 24.710 on flaghill dokala road including spt and plate load test and inclu

Construction of sub structure (abutments) as per drawings provided for double lane modular bridge ( to be constructed by other agency) at km 18.200, km 19.00, km 23.270 and km 24.710 on flaghill dokala road including spt and plate load test and inclu

Read more
Surface preparation and application of various paints on steel surfaces as per standard specification by providing all required materials in connection with composite work for units(avu,sulphur bloc,pru and common mug compressor unit) (parta,b and c)

Surface preparation and application of various paints on steel surfaces as per standard specification by providing all required materials in connection with composite work for units(avu,sulphur bloc,pru and common mug compressor unit) (parta,b and c)

Read more
Construction of sub structure abutments as per drawings for 200 feet single lane modular galvanized steel bridge at km 85.130 on gangtok chungthang road as per approved bridge scheme and drawings by executing all items of works required for launchin

Construction of sub structure abutments as per drawings for 200 feet single lane modular galvanized steel bridge at km 85.130 on gangtok chungthang road as per approved bridge scheme and drawings by executing all items of works required for launchin

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise