Tender Details
Particulars | Details |
---|---|
Title |
Rate Contract For Repairing And Upgradation Of Electric Panels Boards And Starters Etc. Under Phed Pdr Sub Dn. Ii Bikaner Emergent Work Summer 2025
|
Description |
Rate Contract For Repairing And Upgradation Of Electric Panels Boards And Starters Etc. Under Phed Pdr Sub Dn. Ii Bikaner Emergent Work Summer 2025
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 20000 |
Tender Value | |
Place | bikaner |
Link |
AAAAAAAAAA Login to view |
Start Date | April 08, 2025 23:30 |
End Date |
21/04/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Read moreInviting annual rate tender for maintenance work and purchase of painting material of ulb for the year 2025-26
Inviting annual rate tender for maintenance work and purchase of painting material of ulb for the year 2025-26
Read moreBiennial rate contract for 4 nos. manpower supply for assistance of condition based monitoring of critical inst. coal sampling from coal pipe and misc work, mp dept.
Biennial rate contract for 4 nos. manpower supply for assistance of condition based monitoring of critical inst. coal sampling from coal pipe and misc work, mp dept.
Read moreWbpwd/pw(r)/se/shc/nit no 03 of 2025-2026(4th-call)
Sukanta setu(r.o.b) with approaches - replacement of damaged surface course and other allied works of repair and maintenance in footpath ,railing etc under alipore highway sub division under south 24 parganas highway division in the district of sout
Read moreSelection of bus operator/s for procurement, supply, operation and maintenance of electric buses under gross cost contract (gcc) model
Selection of bus operator/s for procurement, supply, operation and maintenance of electric buses under gross cost contract (gcc) model
Read moreWbphed/01/bwn of se/cc of 2025-26 sl.no.5
Balance work such as lds fhtc sinking of tube well road restoration hdd work and other ancially work for 11 nos. pwss under ketugram ii block under katwa sub division under burdwan division phed district purba bardhaman&#x0d &#x0d
Read moreDay to day repairing and replacement work of doors, s, ventilators made of wood, steel, aluminium, pvc for different type of quarters, dormitories, office buildings, phps etc. at dvc, panchet
Day to day repairing and replacement work of doors, s, ventilators made of wood, steel, aluminium, pvc for different type of quarters, dormitories, office buildings, phps etc. at dvc, panchet
Read moreConstruction of power evacuation system for development of 2450 mw solar park at pugal, bikaner
Construction of power evacuation system for development of 2450 mw solar park at pugal, bikaner under lot-1, lot-2 and lot-3 including survey, design, engineering, supply of all equipments /materials, etc along with associated civil works on turnk
Read moreWork contract for repairing and restoration of siemens make dc drive for 125kw dc motor of apron feeder installed at wagon tippler installed at wagon tippler sgtps mppgcl birsinghpur.
Work contract for repairing and restoration of siemens make dc drive for 125kw dc motor of apron feeder installed at wagon tippler installed at wagon tippler sgtps mppgcl birsinghpur.
Read moreOperation and upkeepment of existing deep tube well and iron removal plant (modified type) at malanchaniwas govt. qtr. complex under central-i sub-division, pwd(building) for 365 days during the year 2025-26.
Operation and upkeepment of existing deep tube well and iron removal plant (modified type) at malanchaniwas govt. qtr. complex under central-i sub-division, pwd(building) for 365 days during the year 2025-26.
Read moreof your Industry type