Tender Details
Particulars | Details |
---|---|
Title |
Nctps I Se M Ii Circle Ahp Dn On Site Over Haul Of Ash Slurry Disposal Pumps 3 B1 3 B3 Pump Capacity Of 930 M3 Hr Including Oem Spares
|
Description |
Nctps I Se M Ii Circle Ahp Dn On Site Over Haul Of Ash Slurry Disposal Pumps 3 B1 3 B3 Pump Capacity Of 930 M3 Hr Including Oem Spares
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_517940_1 |
Reference Number |
CE/NCTPSI/SE/MII/SpNo71/24-25 |
Tender Fee | 0 |
EMD | 23550 |
Tender Value | |
Place | NCTPS-I |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=616383 |
Start Date | January 10, 2025 19:30 |
End Date |
23/01/2025 ( Expired 121 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreMtps i m ii circle oahs retrieving the accumulated ash over and under the 08 nos ash slurry pipe streams and removing piled ash on both sides of the ash slurry pipeline streams from b4 to uad area
Mtps i m ii circle oahs retrieving the accumulated ash over and under the 08 nos ash slurry pipe streams and removing piled ash on both sides of the ash slurry pipeline streams from b4 to uad area
Read moreNctpsi semii circle ahp dn breakdown routine maintenance of recovery water line no2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period from the handing over of site to 31 03 2026
Nctpsi semii circle ahp dn breakdown routine maintenance of recovery water line no2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period from the handing over of site to 31 03 2026
Read moreTtps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Ttps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Read moreNctps i se m ii circle echs dn renewal of damaged fire hydrant pipe line side of echs coal yard no 4
Nctps i se m ii circle echs dn renewal of damaged fire hydrant pipe line side of echs coal yard no 4
Read moreNctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreNctps i se m ii circle ichs dn design engineering supply fabrication and erection of additional trestle with bracings of 5b1 with pile foundation for supporting the existing severely corroded weaken trestle no 5a of conveyor 12 a b on emergency basis
Nctps i se m ii circle ichs dn design engineering supply fabrication and erection of additional trestle with bracings of 5b1 with pile foundation for supporting the existing severely corroded weaken trestle no 5a of conveyor 12 a b on emergency basis
Read moreNctps i se m ii circle ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 2nd row
Nctps i se m ii circle ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 2nd row
Read moreNctps i se m ii circle ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 1st row
Nctps i se m ii ahp dn unit i modification of existing chute arrangements by design supply fabrication and erection of y chute arrangements with necessary accessories to connect to pdfac vessel and wet sluicing mixing box in 1st row
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreof your Industry type