Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bichpari, Barwala, Construction Of Banjara Chaupal (Vangy)
|
| Description |
Bichpari, Barwala, Construction Of Banjara Chaupal (Vangy)
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_445329_1 |
|
Reference Number |
202514E12782 A63F 48E3 A90D 8A82ADE9B8AE699DEV |
| Tender Fee | 2180 |
| EMD | 29415 |
| Tender Value | |
| Place | BICHPARI |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=522766 |
| Start Date | May 08, 2025 16:45 |
| End Date |
Expired
20/05/2025
Expired 433 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreBichpari, barwala, construction of bc chaupal (vangy)
Bichpari, barwala, construction of bc chaupal (vangy)
Read moreBichpari, barwala, construction of dhanak chaupal (vangy)
Bichpari, barwala, construction of dhanak chaupal (vangy)
Read moreBichpari, barwala, construction of chamar chaupal (vangy)
Bichpari, barwala, construction of chamar chaupal (vangy)
Read moreDhiktana, barwala, construction of bc chaupal (vangy)
Dhiktana, barwala, construction of bc chaupal (vangy)
Read moreDhani garan, barwala, construction of bc chaupal (vangy)
Dhani garan, barwala, construction of bc chaupal (vangy)
Read moreof your Industry type