Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 6 Lane Vup At Km. 133.200 And 6 Lane Lvup At Km. 133.547 Along With Service Road In Village Sorkhi On Rohtak Hisar Section Of Nh 9 In The State Of Haryana On Epc Mode.
|
| Description |
Construction Of 6 Lane Vup At Km. 133.200 And 6 Lane Lvup At Km. 133.547 Along With Service Road In Village Sorkhi On Rohtak Hisar Section Of Nh 9 In The State Of Haryana On Epc Mode.
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_212023_1 |
|
Reference Number |
PDPD-HSR/HSR-DBL/NH10/EPC/RFP |
| Tender Fee | 10000 |
| EMD | 25.94 Lakh |
| Tender Value | - |
| Place | PIU Hisar |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=233051 |
| Start Date | October 21, 2024 21:30 |
| End Date |
Expired
23/12/2024
Expired 619 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreConstruction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreConstruction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Read moreConstruction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreConstruction of 6 lane vups at km. 96.570 (madina bypass) and km. 106.445 (behlba) with slip roads on both sides on rohtak - hisar section of nh-9 in the state of haryana on epc mode
Construction of 6 lane vups at km. 96.570 (madina bypass) and km. 106.445 (behlba) with slip roads on both sides on rohtak - hisar section of nh-9 in the state of haryana on epc mode
Read moreConstruction of 6-lane vup at km. 207.615 (ing point of milak bypass) on nh-530, in district rampur in the state of uttar pradesh on epc mode
Construction of 6-lane vup at km. 207.615 (ing point of milak bypass) on nh-530, in district rampur in the state of uttar pradesh on epc mode
Read moreConstruction of vup at km 220520 and vup at km 292150 on agraetawah section of nh19 in the state of uttar pradesh on epc mode
Construction of vup at km 220520 and vup at km 292150 on agra etawah section of nh19 in the state of uttar pradesh on epc mode
Read moreCons. rob lvup its approaches with service road km36.140 to 37.500 and vup lvup and its approaches with service road 72.080 to 77.00and vup its approaches with service road 77.900 to 80.00 at mitrol and mundkati on delhi agra nh-2 in haryana on epc
Cons. rob lvup its approaches with service road km36.140 to 37.500 and vup lvup and its approaches with service road 72.080 to 77.00and vup its approaches with service road 77.900 to 80.00 at mitrol and mundkati on delhi agra nh-2 in haryana on epc
Read moreConstruction of lvup/vup at km 149.870 jaisinghpura at km 155.030 binaganj bypass at km 183.780 aranya jod at km 188.870 reliance petrol pump on guna biaora section of nh46 in the state of mp on epc mode
Construction of lvup/vup at km 149.870 jaisinghpura at km 155.030 binaganj bypass at km 183.780 aranya jod at km 188.870 reliance petrol pump on guna biaora section of nh46 in the state of mp on epc mode
Read moreof your Industry type