Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Preparation Of Ppt, Dpr, Fwd Test, Topographical Survey, Axle Load Survey Vdf, Conducting Traffic Census, Soil Expl Test, I.Adina Chakli Road Ws Ch. 0.00km To 2.76km And From Ch. 20.31 To 33.62km Ii.Nimbari Harishchandrapur Road S. Ch. 0.00km To 5.62
|
| Description |
Preparation Of Ppt, Dpr, Fwd Test, Topographical Survey, Axle Load Survey Vdf, Conducting Traffic Census, Soil Expl Test, I.Adina Chakli Road Ws Ch. 0.00km To 2.76km And From Ch. 20.31 To 33.62km Ii.Nimbari Harishchandrapur Road S. Ch. 0.00km To 5.62
|
| Organisation | PW(ROADS)(SH) | State Govt. and UT |
| Tender Id | 2025_SH_837624_1 |
|
Reference Number |
eNIQ-01/2025-26/AE/GHSD/PW(R)D |
| Tender Fee | 0 |
| EMD | 10000 |
| Tender Value | - |
| Place | GAZOLE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1867292 |
| Start Date | April 23, 2025 00:25 |
| End Date |
Expired
30/04/2025
Expired 531 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Preparation of ppt, details project report, falling weight deflectometer test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with strengthening of kaliachak golapganj
Read morePreparation of ppt details project report,fwd test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with widening and strengthening of malda bulbulchandi road
Preparation of ppt details project report,fwd test, topographical survey, axle load survey vdf, conducting traffic census for a continuous period of 7 days 7 x 24 hrs, in connection with widening and strengthening of malda bulbulchandi road
Read morePreparation of ppt, dpr, fwd test, topographical survey, traffic census, soil test, for strengthening work of agampur-raniganj road 0.00 to 8.30 eklakhi-rashikpur road 0.00 to 8.54 bulbulchandi-katlapukur road 7.50 to 14.08 muchia-singabad road8.05km
Preparation of ppt, dpr, fwd test, topographical survey, traffic census, soil test, for strengthening work of agampur-raniganj road 0.00 to 8.30 eklakhi-rashikpur road 0.00 to 8.54 bulbulchandi-katlapukur road 7.50 to 14.08 muchia-singabad road8.05km
Read moreof your Industry type