Tender Details

Particulars Details
Title
Maintenance Of Karawal Nagar Drain Between Rd 0m To Rd 2480m For The Period Of (08) Eight Months For The Year 2024 25.
Description
Maintenance Of Karawal Nagar Drain Between Rd 0m To Rd 2480m For The Period Of (08) Eight Months For The Year 2024 25.
Organisation Irrigation and Flood Control | State Govt. and UT
Tender Id 2024_IFC_262421_1
Reference
Number
57/EE/CD-IV/IFC/2024-25
Tender Fee 0
EMD 77575
Tender Value
Place East
Link https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343968
Start Date September 18, 2024 18:10
End Date

23/09/2024 ( Expired 286 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of an agency to provide jcb for housekeeping work in ffp,hmbp, hmtp and ta div and demolition work in ta division for a period of one year through rate contract

Selection of an agency to provide jcb for housekeeping work in ffp,hmbp, hmtp and ta div and demolition work in ta division for a period of one year through rate contract

Read more
S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

Read more
Hiring an agency to provide 42 unskilled labours for housekeeing work at security paper mill narmadapuram for the period of one year

Hiring an agency to provide 42 unskilled labours for housekeeing work at security paper mill narmadapuram for the period of one year

Read more
For modernization of of link road sabgrur road mehmadpur to nabha via barsat souja rahit basta in mc patiala with 5 year maintenance mc patiala under special assistance tostate for capital investment 202526 600 crore project distt patiala group no.

For modernization of of link road sabgrur road mehmadpur to nabha via barsat souja rahit basta in mc patiala with 5 year maintenance mc patiala under special assistance tostate for capital investment 202526 600 crore project distt patiala group no.

Read more
Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)

Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Read more
Annual maintenance contract for the 6 nos. of electrical substation at voc port for a period of 2 years and extendable one year

Annual maintenance contract for the 6 nos. of electrical substation at voc port for a period of 2 years and extendable one year

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Read more