Tender Details
Particulars | Details |
---|---|
Title |
Samajik Sabhagruh On Government Land Gat No.2/1 At Brahmane Village Tal Amalner , Dist Jalgaon
|
Description |
Construction Of Samajik Sabhagruh On Government Land Gat No.2/1 At&Amp#X0d
Brahmane Village Tal Amalner , Dist Jalgaon
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1090 |
EMD | 13000 |
Tender Value | |
Place | Amalner |
Link |
AAAAAAAAAA Login to view |
Start Date | May 02, 2025 18:35 |
End Date |
07/05/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreM and r of plaster repairing internal painting and other misc civil works in res no 4by11 4by24 4 by 35 2 by 28 2 by 34 2 by 99 2 by 104 2 by 130 and 1 by 94 at indralok hydel colony lucknow
M and r of plaster repairing internal painting and other misc civil works in res no 4by11 4by24 4 by 35 2 by 28 2 by 34 2 by 99 2 by 104 2 by 130 and 1 by 94 at indralok hydel colony lucknow
Read moreConservation and repairs of bhudargad fort at post peth shivapur, tal bhudargad, dist kolhapur (phase 2)
Conservation and repairs of bhudargad fort, at post peth- shivapur, tal bhudargad, dist kolhapur (phase 2)
Read moreConstruction of proposed mrf material recovery facility on gata no 549-0.444 hec and gata no- 556-0.592 hect in village sahasrawan at nagar panchayat payagpur
Construction of proposed mrf material recovery facility on gata no 549-0.444 hec and gata no- 556-0.592 hect in village sahasrawan at nagar panchayat payagpur
Read moreDevelopment of leisure valley phase-ii, commercial cum shopping complex package-iii at plot no. gh 02 sector-tech zone-iv, greater noida (up) on design, engineering, procurement and construction (epc) basis with comprehensive oand m of 2 years
Development of leisure valley phase-ii, commercial cum shopping complex package-iii at 
 plot no. gh 02 sector-tech zone-iv, greater 
 noida (up) on design, engineering, procurement 
 and construction (epc) basis with comprehensive 
 o and m of 2 ye
Read moreAnnual work contract for providing assistance in day to day routine or breakdown maintenance of electrical equipments and ht and lt motors of unit no. 1 and 2, 2x210 mw, at sgtps, mppgcl, birsinghpur .
Annual work contract for providing assistance in day to day routine or breakdown maintenance of electrical equipments and ht and lt motors of unit no. 1 and 2, 2x210 mw, at sgtps, mppgcl, birsinghpur .
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of bridge and approach road on hindon river at km 35 of meerut- baraut state highway no. 119 in dist. baghpat (u.p.)
Construction of bridge and approach road on hindon river at km 35 of meerut- baraut state highway no. 119 in dist. baghpat (u.p.)
Read moreAllotment of land on long term lease of 10 years on as is where is basis in zone z- 2 plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category
Allotment of land on long term lease of 10 years on as is where is basis in zone z- 2 plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category
Read moreof your Industry type