Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Sh5 To Rakaswade Road Vr 15 Km 0/00 To 3/00 Tal Nandurbar Dist Nandurbar.
|
Description |
Improvement To Sh5 To Rakaswade Road Vr 15 Km 0/00 To 3/00 Tal Nandurbar Dist Nandurbar.
|
Organisation | RDD-CEO-NANDURBAR | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2500 |
EMD | 42000 |
Tender Value | |
Place | Nandurbar |
Link |
AAAAAAAAAA Login to view |
Start Date | June 02, 2025 14:30 |
End Date |
09/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreSurface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Surface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Surfacing works of gsb 15 cm thick wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Read moreConstruction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Construction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Read moreImprovement work by paver finisher of the road from main road 3/250 to 3/47 and from 3/182 to 3/226 in viraj khand under chinhat second ward.
Improvement work by paver finisher of the road from main road 3/250 to 3/47 and from 3/182 to 3/226 in viraj khand under chinhat second ward.
Read moreof your Industry type