Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaining Wall Of 500m Along Ob Dumps Under Gocp Of Basundhara Area.
|
Description |
Construction Of Retaining Wall Of 500m Along Ob Dumps Under Gocp Of Basundhara Area.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_315039_1 |
Reference Number |
MCL/GM/BA/C/e-tender/24-25/54 dt.14.08.2024 |
Tender Fee | 0 |
EMD | 2.34 Lakh |
Tender Value | |
Place | GM OFFICE, BASUNDHARA AREA, MCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326483 |
Start Date | August 14, 2024 15:30 |
End Date |
29/08/2024 ( Expired 289 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreAppointment of consultant for verification, rating and monitoring of the facilities and infrastructure such as wayside amenities, fuel stations, eateries, trauma centres, including facilities under humsafar policy, etc. along national highways
Appointment of consultant for verification, rating and monitoring of the facilities and infrastructure such as wayside amenities, fuel stations, eateries, trauma centres, including facilities under humsafar policy, etc. along national highways
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreDesign and construction of property development buildings near thirumangalam metro station along the viaduct in open land parcels including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works
Design and construction of property development buildings near thirumangalam metro station along the viaduct in open land parcels including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreProcurement of 190t dumpers along with consumable spares and consumables for warranty period of one year and spares and consumables for post warranty period of 11 years for 190t dumpers under spares cost cap.
Procurement of 190t dumpers along with consumable spares and consumables for warranty period of one year and spares and consumables for post warranty period of 11 years for 190t dumpers under spares cost cap.
Read moreLife enhancement of various super structures at chp area of ktps under capex 2025 26
Life enhancement of various super structures at chp area of ktps under capex 2025 26
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreof your Industry type