Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Top Coat Deck Covering
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5645628 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 28, 2024 00:40 |
| End Date |
Expired
18/12/2024
Expired 661 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ANUSHA ENTERPRISES | 23-12-2024 21:50:25 | Registered with designated Agency / Authority | MSE | Qualified |
| 2 | DS Enterprises | 23-12-2024 22:45:21 | MSE | MSE | Qualified |
| 3 | GTF MARINE TECHNOLOGY INDIA PRIVATE LIMITED | 18-12-2024 15:26:30 | Registered with designated Agency / Authority | MSE | Disqualified |
| 4 | J K ASSOCIATES | 21-12-2024 19:22:24 | MSE | MSE | Disqualified |
| 5 | SAMRIDHI MARINE ENTERPRISES | 24-12-2024 17:10:35 | Registered with designated Agency / Authority | MSE | Qualified |
| 6 | SS ENGINEERING WORKS | 23-12-2024 22:30:16 | MSE | MSE | Qualified |
Tender for personal accident & traveling insurance covering various students & staffs traveling for 2026-27 karnataka darshana tour program across karnataka
Tender for personal accident & traveling insurance covering various students & staffs traveling for 2026-27 karnataka darshana tour program across karnataka
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreConstruction of a road and drain—involving elevation work—in ward no. 25 (new bus stand, noori masjid lane) of bettiah, covering the stretch from mohammad zishan's house to tabrez alam's house via the mosque, from the mosque to kalam miyan's house, and from sagir miyan's house to the overseer's house.
Construction of a road and drain—involving elevation work—in ward no. 25 (new bus stand, noori masjid lane) of bettiah, covering the stretch from mohammad zishan's house to tabrez alam's house via the mosque, from the mosque to kalam miyan's house, and from sagir miyan's house to the overseer's house.
Read moreRoad construction work in ward no. 05 of bettiah municipal corporation, covering the stretches from satyanand srivastava's house to manjar's house, from manjar's house to gopichand's house, and from sajid's house to the main road; as well as the construction of a road and drain from ibrahim's house to riyaz's house.
Road construction work in ward no. 05 of bettiah municipal corporation, covering the stretches from satyanand srivastava's house to manjar's house, from manjar's house to gopichand's house, and from sajid's house to the main road; as well as the construction of a road and drain from ibrahim's house to riyaz's house.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreUnder the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Under the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Read morePcc road construction work in anees colony (ward no. 11, bettiah municipal corporation) covering the following stretches: lane no. 02 (from janesar ji’s house to sohail ji’s house), lane no. 03 (from amin ansari’s house to imteyaz ahmed’s house), lane no. 04 (from tanveer alam’s house to ushak khan’s house), lane no. 05 (from shamim ahmed’s house to dr. asadullah’s house), and the stretch from nusrat jamal’s house to aslam ji’s house.
Pcc road construction work in anees colony (ward no. 11, bettiah municipal corporation) covering the following stretches: lane no. 02 (from janesar ji’s house to sohail ji’s house), lane no. 03 (from amin ansari’s house to imteyaz ahmed’s house), lane no. 04 (from tanveer alam’s house to ushak khan’s house), lane no. 05 (from shamim ahmed’s house to dr. asadullah’s house), and the stretch from nusrat jamal’s house to aslam ji’s house.
Read moreof your Industry type