Tender Details

Particulars Details
Title
Work For Removal Of Old Sewer Line And Construction Of New Sewer Line In Office Residential Complex Colony And Temporary Colony Under Njhps Nathpa
Description
Work For Removal Of Old Sewer Line And Construction Of New Sewer Line In Office Residential Complex Colony And Temporary Colony Under Njhps Nathpa
Organisation SJVN Ltd | Central Govt. Ministry/Department
Tender Id 2024_SJVNL_779974_1
Reference
Number
PCD-2913
Tender Fee 1770
EMD 35475
Tender Value
Place Jhakri
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1090819
Start Date January 24, 2025 23:30
End Date

07/02/2025 ( Expired 149 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year

Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Non comprehenssive biennial rate contract for di dr of epm alternator of under

Non comprehenssive biennial rate contract for di dr of epm alternator of under&#x0d construction boat sm6 and commissioned boats having mdl d448/gds liabilities&#x0d project p75

Read more
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
Consultancy services for authority engineer for supervision of new construction of major bridge with approaches from km 0.000 to 1.200 madhopur -badabanta section of nh-20 in the state of odisha

Consultancy services for authority engineer for supervision of new construction of major bridge with approaches from km 0.000 to 1.200 madhopur -badabanta section of nh-20 in the state of odisha

Read more
Cs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode

Cs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode

Read more
Request for proposal (rfp) for selection of concessionaire for development of plug and play facilities under ppp mode in 50 acres on dbfot basis with a concession period of 45 years in sipcot panapakkam

Request for proposal (rfp) for selection of&amp#x0d concessionaire for development of plug and&amp#x0d play facilities under ppp mode in 50 acres on&amp#x0d dbfot basis with a concession period of 45 years in&amp#x0d sipcot panapakkam

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise