Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fresh Electrical Wiring Work Of Excavation Workshop Office At Kedla Ocp Under Hazaribagh Area
|
| Description |
Fresh Electrical Wiring Work Of Excavation Workshop Office At Kedla Ocp Under Hazaribagh Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_293640_1 |
|
Reference Number |
PO/KOCP/EnM/Tender/23-24/02 |
| Tender Fee | - |
| EMD | 2500 |
| Tender Value | - |
| Place | KOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 13, 2023 16:30 |
| End Date |
Expired
23/11/2023
Expired 1056 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rewiring/repairing of enm workshop and unit store of topa ocp under kuju area.
Rewiring/repairing of enm workshop and unit store of topa ocp under kuju area.
Read moreSpecial repairs to electrical wiring and fittings of district workshop (health) in thanjavur district.
Special repairs to electrical wiring and fittings of district workshop (health) in thanjavur district.
Read moreRe-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.
Re-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.
Read moreConstruction of permanent pcc road over new access trench and extension up to the excavation store shed at jagannathpur ocp, bhatgaon area including 05 (five) years comprehensive maintenance
Construction of permanent pcc road over new access trench and extension up to the excavation store shed at jagannathpur ocp, bhatgaon area including 05 (five) years comprehensive maintenance
Read morePeriodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Read moreA) maintenance of 11 kv/3.3 kv/440 v ohl for period of 01 year at topa project under kuju area.b) illumination at excavation and enm workshop, settling tank pump station with aerial bunch cable, sky netting arrangements at topa project kuju area.
A) maintenance of 11 kv/3.3 kv/440 v ohl for period of 01 year at topa project under kuju area.b) illumination at excavation and enm workshop, settling tank pump station with aerial bunch cable, sky netting arrangements at topa project kuju area.
Read moreCustom bid for services - supplying of drinking water through water tanker(8000 liters) at mtk office, po office, hemm workshop, substation and supply of packed cool drinking water in 20 liter thermos jar at different places at garhanabahal ocp of ..
Custom bid for services - supplying of drinking water through water tanker(8000 liters) at mtk office, po office, hemm workshop, substation and supply of packed cool drinking water in 20 liter thermos jar at different places at garhanabahal ocp of ..
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreFresh wiring work of dav public school kedla at kedla ocp under hazaribagh area.
Fresh wiring work of dav public school kedla at kedla ocp under hazaribagh area.
Read moreFresh electrical wiring work of crpf camp at kedla ocp under hazaribagh area
Fresh electrical wiring work of crpf camp at kedla ocp under hazaribagh area
Read moreof your Industry type