Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Main Vertical Shaft With Two Lock Nuts And Three Keys Suitable For Xrp803 Mills 2 Nos To Mettur Thermal Power Station I
|
Description |
Supply Of Main Vertical Shaft With Two Lock Nuts And Three Keys Suitable For Xrp803 Mills 2 Nos To Mettur Thermal Power Station I &Amp#X0d
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_488183_1 |
Reference Number |
CE MTPS-I SE PA EE SI AEE3 OTNo 54 24 25 |
Tender Fee | 0 |
EMD | 12000 |
Tender Value | |
Place | Mettur Thermal Power Station-I |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=580126 |
Start Date | September 25, 2024 23:00 |
End Date |
08/10/2024 ( Expired 273 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Read moreProviding metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel
Providing metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel
Read moreAnnual maintenance and repair of colony roads at madhuban area along with the main road from atharabanki to police station square for the year 2025-26
Annual maintenance and repair of colony roads at madhuban area along with the main road from atharabanki to police station square for the year 2025-26
Read moreMaintenance of 3 nos. 100 mw hydro generator units of chamera ii power station karian distt. chamba h.p for two years i.e. 2025-26 to 2026-27
Maintenance of 3 nos. 100 mw hydro generator units of chamera ii power station karian distt. chamba h.p for two years i.e. 2025-26 to 2026-27
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati
Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)
Read moreSupply and commissioning of 0 2(two) unit of c arm machine for dept of neurosurgery at bin, annex-i, ipgme and r-sskm hospital, kolkata
Supply and commissioning of 0 2(two) unit of c arm machine for dept of neurosurgery at bin, annex-i, ipgme and r-sskm hospital, kolkata
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Read moreWork for shifting of filled and empty hydrogen cylinders from hydrogen plant 2 and 3 to unit 10 11 2x250 mw ,other power station and for hst etc at stps mppgclsarni
Work for shifting of filled and empty hydrogen cylinders from hydrogen plant 2 and 3 to unit 10 11 2x250 mw ,other power station and for hst etc at stps mppgclsarni
Read moreTtps es circle em i providing temporary lt 3 phase supply arrangement for various overhauling works connected with tm i and cmd i and other emergency lighting works in p h area and disconnection of power cables of various valve motors as dema
Ttps es circle em i providing temporary lt 3 phase supply arrangement for various overhauling works connected with tm i and cmd i and other emergency lighting works in p h area and disconnection of power cables of various valve motors as dema
Read moreFor supply and work for construction of new 01 nos 33 kv supreme bay against deposit work at 132 kv sub station pukhrayan kanpur dehat under etd-i kanpur
For supply and work for construction of new 01 nos 33 kv supreme bay against deposit work at 132 kv sub station pukhrayan kanpur dehat under etd-i kanpur
Read moreof your Industry type