Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Infrastructure Alert: Road Widening And Strengthening Project 🛣️ The Chief Engineer Pwd Central Zone, Lucknow, On Behalf Of The State Government, Invites Bids For The Widening And Strengthening Of The Road From Iim Lucknow To The Outer Ring Road At Raitha Underpass, With A Total Length Of 8.400 Km. 📅 Bid Submission Deadline: July 12, 2024, 12:00 Pm Tender Fee: Inr 2714 Emd: Inr 30,00,000 This Project Is A Critical Component Of Infrastructure Development In Lucknow And Requires Bidders To Demonstrate Expertise In Road Construction And Adherence To The Highest Standards Of Quality And Safety. Keywords: Road Widening, Strengthening, Infrastructure, Pwd, Lucknow, Government Tender, Emd, Bid Submission| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Upto Two Lane Of Iim Lucknow To Outer Ring Road Raitha Underpass Road Length 8.400 Km.
|
| Description |
Widening And Strengthening Upto Two Lane Of Iim Lucknow To Outer Ring Road Raitha Underpass Road Length 8.400 Km.
|
| Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
| Tender Id | 2024_CEUCZ_935142_1 |
|
Reference Number |
3572/523C(2)-LKO.CIR./2024-25 |
| Tender Fee | 2714 |
| EMD | 30 Lakh |
| Tender Value | - |
| Place | Lucknow |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1616603 |
| Start Date | July 03, 2024 23:30 |
| End Date |
Expired
19/07/2024
Expired 818 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening and strengthening of 04 lane on baraudha chauraha to roadways chauraha road with including 5 years of maintenance
Widening and strengthening work
Read moreWidening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)
Widening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)
Read moreWidening and strengthening of sahijana-kursath-balamau road odr ch 0-000 to ch 8-000 lingth 8-00 km in district hardoi with five year maintinance
Widening and strengthening of sahijana-kursath-balamau road odr ch 0-000 to ch 8-000 lingth 8-00 km in district hardoi with five year maintinance
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreConstruction of animal underpass (2 nos) in road widening and strengthening revdar jaswantpura bhinmal bagda rangala chounchwa phanta road (sh-16a) km 65/0 to 115/0 job no. 1050/crif/rj/2023-24
Construction of animal underpass (2 nos) in road widening and strengthening revdar jaswantpura bhinmal bagda rangala chounchwa phanta road (sh-16a) km 65/0 to 115/0 job no. 1050/crif/rj/2023-24
Read moreWidening and strengthening of hardoi pihani chapartala road (mdr-43c) km-16 to hariyawan block head quarter to korigawan shahpur via jalalpur thamarava to peng road in dist. hardoi with five year maintenance
Widening and strengthening of hardoi pihani chapartala road (mdr-43c) km-16 to hariyawan block head quarter to korigawan shahpur via jalalpur thamarava to peng road in dist. hardoi with five year maintenance
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreWidening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (koksara) to km 294.280 (nabarangpur) on nh-26 in kalahandi and nabarangpur districts in the state of odisha under the epc mode
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (koksara) to km 294.280 (nabarangpur) on nh-26 in kalahandi and nabarangpur districts in the state of odisha under the epc mode
Read moreof your Industry type