Tender Details
Particulars | Details |
---|---|
Title |
Imp Construction Of Open Surface Drain And Providing Cement Concrete From H No I46 To I54 In Harkesh Nagar Ward No 177 Central Zone
|
Description |
Imp Construction Of Open Surface Drain And Providing Cement Concrete From H No I46 To I54 In Harkesh Nagar Ward No 177 Central Zone
|
Organisation | Municipal Corporation of Delhi | Public Sector Undertakings |
Tender Id | 2024_MCD_216938_1 |
Reference Number |
MCD/TR/9205/2024_5_1_1/1 |
Tender Fee | 590 |
EMD | 30612 |
Tender Value | |
Place | Central, Harkesh Nagar |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=240273 |
Start Date | December 01, 2024 00:25 |
End Date |
05/12/2024 ( Expired 184 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConstruction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreof your Industry type