Tender Details
Particulars | Details |
---|---|
Title |
Providing And Shifting Of M.S.Flat 50 X 10 Mm A From Prayagraj/Kanpur To Dalmau B Pump Canal, District Unnao Including Loading, Unloading And Stacking.
|
Description |
Providing And Shifting Of M.S.Flat 50 X 10 Mm A From Prayagraj/Kanpur To Dalmau B Pump Canal, District Unnao Including Loading, Unloading And Stacking.
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id | 2025_UPIDM_1004283_1 |
Reference Number |
SHORT TERM E-TENDER NOTICE No. 49 / E.E. /S.S.K.-6/2024-25 |
Tender Fee | 854 |
EMD | 48000 |
Tender Value | |
Place | DAUNDIYA KHERA UNNAO |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1795415 |
Start Date | February 10, 2025 15:30 |
End Date |
17/02/2025 ( Expired 62 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of pcc poles and anchor blocks from pilot workshop mohali to various destinations in punjab including loading, unloading and stacking.
Transportation of 68,900 no. 9m long pcc poles, 2560 no. 11m long pcc poles and 30,000 no.&#x0d 500mm diameter anchor blocks from pilot workshop mohali to various destinations in punjab&#x0d including loading, unloading and stacking.
Read moreMechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump fod through nmdc weigh bridges in loading plant area
Mechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump (fod) through nmdc weigh bridges in loading plant area at an average lead distance of 1.80-
Read moreContract for loading, transportation of coal by road mode from different collieries of ccl to dvc ctps coal yard and unloading in the slab 05 to 25 km and 26 to 50 km
Contract for loading, transportation of coal by road mode from different collieries of ccl to dvc ctps coal yard and unloading in the slab 05 to 25 km and 26 to 50 km
Read moreBiennial rate contract for road transportation of electrical equipment/materials, including loading, unloading and proper stacking from zonal testing unit , siliguri to abhikhan and kolkata jurisdiction
Biennial rate contract for road transportation of electrical equipment/materials, including loading, unloading and proper stacking from zonal testing unit , siliguri to abhikhan , wbsedcl , saltlake , kol-91, wbsedcl and kolkata jurisdiction vis-a-vi
Read more692 -providing and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
692 -providing and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
Read moreEstimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Read moreEngagement of packing and moving agency for dismantling, packing, loading, shifting, unloading, unpacking, and re-arrangement of office furniture, files, equipments, and all other materials from offices and sections to new adm building at svnit,surat
Dismantling, packing, loading, shifting, unloading, unpacking, and re-arrangement of office furniture, files, equipments, and all other materials from offices and sections running in p.g. section, med and other buildings to new adm building
Read moreSafe loading carriage, unloading and proper stacking of transformer repairing materials
Safe loading carriage, unloading and proper stacking of transformer repairing materials from workshop/store centre gorakhpur to different transformer repairing workshop centre under ewd gorakhpur
Read moreSafe loading carriage, unloading and proper stacking of transformer repairing materials
Safe loading carriage, unloading and proper stacking of transformer repairing materials from workshop/store centre basti to transformer repairing workshop centre basti, siddharth nagar and sant kabir nagar under ewd basti&#x0d &#x0d
Read moreLoading, unloading, transport and stacking placing in safe custody of various structure material and equipment from various rvpn stores to site stores of 132 kv gss palra and dewata and replacement of h-pole line of the aen t and c rvpn ajmer
Loading, unloading, transport and stacking placing in safe custody of various structure material and equipment from various rvpn stores to site stores of 132 kv gss palra and dewata and replacement of h-pole line of the aen t and c rvpn ajmer and
Read moreof your Industry type