Tender Details
Particulars | Details |
---|---|
Title |
Clearing Touching And Overhanging Of Trees, Light Jungles, Removing Vegetation Growth Etc Of The 220 Kv Pallivasal Udumalpet (2 Pvud) Feeder Under Linemaintenance Section,Vazhathope
|
Description |
Clearing Touching And Overhanging Of Trees,&Amp#X0d
Light Jungles, Removing Vegetation Growth Etc&Amp#X0d
Of The 220 Kv Pallivasal Udumalpet (2 Pvud)&Amp#X0d
Feeder Under Linemaintenance&Amp#X0d
Section,Vazhathope
|
Organisation | Kerala State Electricity Board | State Govt. and UT |
Tender Id | 2025_KSEB_727426_1 |
Reference Number |
01/TSD/NDKM/2024-25 dated 17.01.2025 |
Tender Fee | 1534 |
EMD | 16100 |
Tender Value | |
Place | Pallivasal -Udumalpett 220kV Line |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1157933 |
Start Date | January 22, 2025 17:30 |
End Date |
07/02/2025 ( Expired 74 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Retrofitting of 220 kv isolators for proposed 220 kv raghunathpur1 and 2 feeder under capex 24- 25 under emoph dept., stps, wbpdcl
Retrofitting of 220 kv isolators for proposed 220 kv raghunathpur1 and 2 feeder under capex 24- 25 under emoph&#x0d dept., stps, wbpdcl
Read moreMaintenance works and deployment of manpower for oandm of 220 kv sub station chandpur and 132 kv sub station hasanpur under etc ii moradabad
Maintenance works and deployment of manpower for oandm of 220 kv sub station chandpur and 132 kv sub station hasanpur under etc ii moradabad
Read moreRepair to leakage/seepage of shaft area removing of vegetation growth repair to ci/pvc pipe line crumple sheet and othe connected work rs colaba and rashi area under age b/r-ii, ge (nw) navy nagar, colaba, mumbai
Repair to leakage/seepage of shaft area removing of vegetation growth repair to ci/pvc pipe line crumple sheet and othe connected work rs colaba and rashi area under age b/r-ii, ge (nw) navy nagar, colaba, mumbai
Read moreFor the emergency work of replacement transportation etc of 132 kv and 220 kv power transformer under transmission west zone meerut
For the emergency work of replacement transportation etc of 132 kv and 220 kv power transformer under transmission west zone meerut
Read moreSupply and installation of lt distribution boxes and other misc. work and laying of lt ab cable at site chhidderwala (asha pot,nwab wala,chak jogiwala,jogiwala maffi,chhidderwala etc) 11 kv chhidderwala feeder under edsd, raiwala under edd, rishikesh
Supply and installation of lt distribution boxes and other misc. work and laying of lt ab cable at site chhidderwala (asha pot,nwab wala,chak jogiwala,jogiwala maffi,chhidderwala etc) 11 kv chhidderwala feeder under edsd, raiwala under edd, rishikesh
Read moreWbiw ee-i ldcd e-nit-1 2025-26 sl 10
Clearing and removing of water hyacinth plastic thermocol garbage etc including clearing of jungles along the slope of bank from ch 0.00 m to 1885 m of nayabaz r c c u trough drain for the period of 365 days under under bankra ii iii g
Read moreFabrication, galvanizing, testing and supply of complete package of galvanised steel structures along with required g. i. bolts with nuts isi marked, spring washers, etc. for 220 kv and 132 kv grid substation under bn- 9015002423
Fabrication, galvanizing, testing and supply of complete package of galvanised steel structures along with required g. i. bolts with nuts isi marked, spring washers, etc. for 220 kv and 132 kv grid substation under bn- 9015002423
Read moreConstruction of 11 kv line using acsr raccoon for interlinking kuntar and bellur feeder through ballakkad-minchipadavu under electrical section, mulleriya
Construction of 11 kv line using acsr raccoon for interlinking kuntar and bellur feeder through ballakkad-minchipadavu under electrical section, mulleriya
Read moreRight of way clearing cutting and removing side and under growth of 1poma loc 1 to 27 and 1shch loc 51 to 78
Right of way clearing cutting and removing side and under growth of 1poma loc 1 to 27 and 1shch loc 51 to 78
Read moreAnnual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii
Annual maintenance of kangsabati office colony by cutting uprooting and clearing jungles, grass,......... including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing from site for a year (365 days) under k.c. s.d no-vii
Read moreof your Industry type