Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 2 Nos Explosion Proof Isolation Stop Pings(fly Ash Bricks) At Travelling Dip And Haulage Dip And 2 Nos. Normal Isolation Stoppings At 1 L Between 1 De And Air Shaft Bottom And 2 De At Chhatarpur Mine No.2, Pathakhera Area, Wcl.
|
Description |
Construction Of 2 Nos Explosion Proof Isolation Stop Pings(fly Ash Bricks) At Travelling Dip And Haulage Dip And 2 Nos. Normal Isolation Stoppings At 1 L Between 1 De And Air Shaft Bottom And 2 De At Chhatarpur Mine No.2, Pathakhera Area, Wcl.
|
Organisation | Western Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_WCL_311231_1 |
Reference Number |
PK3550-E-MIN-0015-2024-25 |
Tender Fee | 0 |
EMD | 53700 |
Tender Value | |
Place | CHHATARPUR 2 MINE PATHAKHERA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322516 |
Start Date | June 26, 2024 22:30 |
End Date |
06/07/2024 ( Expired 315 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hydraulic roof bolting with resin capsules by contractual means with providing 5 nos dgms approved hydraulic roof bolting machine in the panel w 5a and w 5b of lower workable seam at chhatarpur mine no 1, pathakhera area, wcl
Hydraulic roof bolting with resin capsules by contractual means with providing 5 nos dgms approved hydraulic roof bolting machine in the panel w 5a and w 5b of lower workable seam at chhatarpur mine no 1, pathakhera area, wcl
Read moreConstruction of 4 no isolation stoppings (fly ash bricks) including all materials in 29dn-ii depillaring district in lws tawa 2 mine, pathakhera area, wcl
Construction of 4 no isolation stoppings (fly ash bricks) including all materials in 29dn-ii depillaring district in lws tawa 2 mine, pathakhera area, wcl
Read moreConstruction of 72 nos. ventilation stoppings by use of fly ash brick in c.m. panel 37la, 34d, 39d, 34r and 40r dev. district of 10b seam at haldibari ug mine
Construction of 72 nos. ventilation stoppings by use of fly ash brick in c.m. panel 37la, 34d, 39d, 34r and 40r dev. district of 10b seam at haldibari ug mine
Read moreConstruction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area
Construction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area
Read moreErection of 20 nos. steel girders at haulage incline and 19l/31d at chhatarpur mine no-1, pathakhera area, wcl
Erection of 20 nos. steel girders at haulage incline and 19l/31d at chhatarpur mine no-1, pathakhera area, wcl
Read moreReplastering of 34 nos. isolation and sectionalisation stoppings including curing to pr air leakage of stoppings in ic iii, iva and vb2 seam at vishnupuri underground mine no. ii of pench area
Replastering of 34 nos. isolation and sectionalisation stoppings including curing to pr air leakage of stoppings in ic iii, iva and vb2 seam at vishnupuri underground mine no. ii of pench area
Read moreWork for sealing of the entries by constructing 03 nos. explosion proof stopping of r.c.c. wall for 03 nos. of adits and 01nos. isolation stopping of r.c.c. wall for the air-shaft of no.3 seam of n.c.p.h colliery r-6 mine
Work for sealing of the entries by constructing 03 nos. explosion proof stopping of r.c.c. wall for 03 nos. of adits and 01nos. isolation stopping of r.c.c. wall for the air-shaft of no.3 seam of n.c.p.h colliery r-6 mine
Read moreConstruction of 28 nos. ventilation stoppings for new development 40d(main dip),74lw district and some places in main intake main intake and return airway etc. for proper ventilation in bottom seam(seam-0) including material cost at rehar ug mine
Construction of 28 nos. ventilation stoppings for new development 40d(main dip),74lw district and some places in main intake main intake and return airway etc. for proper ventilation in bottom seam(seam-0) including material cost at rehar ug mine
Read moreConstruction of 06 nos. ventilation stopping (fly ash bricks) including all materials and repairing of 01 air crossing at 30d/2ln, 11 ventilation stopping from 1ln/28dn-29dn to 12ln/ 28dn-29dn in lws of tawa 2 mine, pathakhera area, wcl
Construction of 06 nos. ventilation stopping (fly ash bricks) including all materials and repairing of 01 air crossing at 30d/2ln, 11 ventilation stopping from 1ln/28dn-29dn to 12ln/ 28dn-29dn in lws of tawa 2 mine, pathakhera area, wcl
Read moreWork of construction of 07 nos. ventilation in b-1 panel and 13 nos ventilation stopping b-2 panel (fly ash bricks) including all materials development district in bws at tawa 2 mine, pathakhera area, wcl.
Work of construction of 07 nos. ventilation in b-1 panel and 13 nos ventilation stopping b-2 panel (fly ash bricks) including all materials development district in bws at tawa 2 mine, pathakhera area, wcl.
Read moreof your Industry type