Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rectification Works On Pindwada Sawroopganj Section Of 4 L Nh 14 (New Nh 27)and Pindwada Udaipur Section Of 4 L Nh 76 (New Nh 27) In The State Of Rajasthan On Risk And Cost Of Contractor On Item Rate Basis
|
| Description |
Rectification Works On Pindwada Sawroopganj Section Of 4 L Nh 14 (New Nh 27)and Pindwada Udaipur Section Of 4 L Nh 76 (New Nh 27) In The State Of Rajasthan On Risk And Cost Of Contractor On Item Rate Basis
|
| Organisation | National Highways Authority of India | RO-Jaipur - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 10000 |
| EMD | 2.21 Lakh |
| Tender Value | 1.11 Crore |
| Place | |
| Link | Login to view |
| Start Date | October 07, 2026 14:30 |
| End Date |
Open
22/10/2026
9 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha
Read moreNhidcl/ro-agt/stmc/risk cost/nh-108b nh-208/p-i,ii,iv,v/2026-27/783
Restoration works at the risk and cost of the epc contractor through stmc in the state of tripura during fy 2026 27 on percentage rate and work order basis 3rd call for the following road stretches kailashahar khowai package i kailashahar khowai pack
Read moreRectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha
Read moreRectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 13) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreRectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Rectification work on 8l access controlled expressway (pkg 14) section of delhi vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis
Read moreRectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor
Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor
Read moreConstruction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Construction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Read moreExecution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read moreRectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire
Rectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire
Read moreof your Industry type