Tender Details

Particulars Details
Title
Providing Foundations For Gantry Loop Take Up, Tail End Drum Of C2 C2 A Conveyor Belt And Drive Head Sheds For C2 C2 A Belts And Drive Head Bed For C2 A Belt At Kk 1 Chp, Mandamarri Area, Mancherial Dist, T G
Description
Providing Foundations For Gantry Loop Take Up, Tail End Drum Of C2 And C2 A Conveyor Belt And Drive Head Sheds For C2 And C2 A Belts And Drive Head Bed For C2 A Belt At Kk 1 Chp, Mandamarri Area, Mancherial Dist, T G
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 610361
Reference
Number
MMR/CVL/E-MM/T-40/2025-26
Tender Fee 1032
EMD 37482
Tender Value
Place TS
Link
View Original Tender Notice

http://eprocurement.telangana.gov.in/

Start Date July 01, 2025 21:30
End Date
Expired 15/07/2025

Expired 334 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing foundations for c1, c2 and c2a gantry of conveyor belt and drive head shed at kk1 chp works, mandamarri area, mancherial dist, tg.

Providing foundations for c1, c2 and c2a gantry of conveyor belt and drive head shed at kk1 chp works, mandamarri area, mancherial dist, tg.

Read more
Dismantling of 0xd belt conveyor and 30l belt conveyor with drive head, discharge unit, loop take up unit, tail end unit, belt structure, electricals etc. and salvaging them from this panel in r-viia seam

Dismantling of 0xd belt conveyor and 30l belt conveyor with drive head, discharge unit, loop take up unit, tail end unit, belt structure, electricals etc. and salvaging them from this panel in r-viia seam

Read more
Providing chain link mesh fencing along conveyor belt from kkocp chp to wharf loading system at proposed kk-1 chp siding, mandamarri area, mancherial dist., telangana state

Providing chain link mesh fencing along conveyor belt from kkocp chp to wharf loading system at proposed kk-1 chp siding, mandamarri area, mancherial dist., telangana state

Read more
Construction of foundation for installation of conveyor belt assembly (drive head, fix drum, loop take up, motorized winch, tail end drum) and construction of concrete slab for alignment of stool and jamming of stool legs by cement concrete in propos

Construction of foundation for installation of conveyor belt assembly (drive head, fix drum, loop take up, motorized winch, tail end drum) and construction of concrete slab for alignment of stool and jamming of stool legs by cement concrete in propos

Read more
Repairing of loop take up drum of conveyor belt for d18 development panel of moonidih project. sl.no. dev.lt-1,2,3,4

Repairing of loop take up drum of conveyor belt for d18 development panel of moonidih project. sl.no. dev.lt-1,2,3,4

Read more
Installation of 640 mtr. 1000mm belt conveyor (discharge point 31s and tail end 17s/20e) with drive head and loop take arrangement in seam-v, ncph colliery r-6 mine.

Installation of 640 mtr. 1000mm belt conveyor (discharge point 31s and tail end 17s/20e) with drive head and loop take arrangement in seam-v, ncph colliery r-6 mine.

Read more
Cleaning of spillage muck/debris of tc06 belt conveyor by digging with pick/shovel and loading on elt conveyor by carrying manually up to distance of 50mt and changing the tc06 belt 3 pair loop take up structure and tail end drum in xvi(t) seam

Cleaning of spillage muck/debris of tc06 belt conveyor by digging with pick/shovel and loading on elt conveyor by carrying manually up to distance of 50mt and changing the tc06 belt 3 pair loop take up structure and tail end drum in xvi(t) seam

Read more
Installation of one no. drive drum, one no. driven drum and one no. loop take-up drum at 80l belt conveyor of lhcm-1, r-viia seam at 3n4 incline, j.p.colliery

Installation of one no. drive drum, one no. driven drum and one no. loop take-up drum at 80l belt conveyor of lhcm-1, r-viia seam at 3n4 incline, j.p.colliery

Read more
Re-handling of spilled raw coal/slurry from head drum to tail drum and under, around the take-up pulley of 133a b/c and gantry, beside the gantry of 116a and b and under and around the take-up pulley of 116a belt conveyor of pre-washery section of kw

Re-handling of spilled raw coal/slurry from head drum to tail drum and under, around the take-up pulley of 133a b/c and gantry, beside the gantry of 116a and b and under and around the take-up pulley of 116a belt conveyor of pre-washery section of kw

Read more
Di of existing pipelines 450mm di, 250mm hdpe, 200mm ms 100mm gi pipes besides national highway-363 for passage of coal belt, kk1 chp, mandamarri area, mancherial dist, t g

Di of existing pipelines 450mm di, 250mm hdpe, 200mm ms and 100mm gi pipes besides national highway-363 for passage of coal belt, kk1 chp, mandamarri area, mancherial dist, t g

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise