Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Phc Level Ii At Sataun, Tehsil Kamrau, District Sirmour ( Hp )
|
Description |
( Sh Construction Of Building Portion , Providing Water Supply, Sanitary Installation, Construction Of Septic Tank With Soak Pit, Rain Water Harvesting Tank And Site Development I.E. With Construction Of Boundary Walls Etc. )
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_94982_1 |
Reference Number |
NIT-6027-6126dt4-11-2024 |
Tender Fee | 5000 |
EMD | 2.11 Lakh |
Tender Value | |
Place | Shillai |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=139566 |
Start Date | November 07, 2024 15:30 |
End Date |
13/11/2024 ( Expired 160 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreProcurement of low level light weight radar (lllwr mk ii)
Procurement of low level light weight radar (lllwr mk ii)
Read moreIt addl pune infotech park ii industrial area rajiv gandhi infotech park phase ii... construction
It addl pune infotech park ii industrial area rajiv gandhi infotech park phase ii... construction&#x0d of flyover at laxmi chowk hinjawadi pune&#x0d
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreConsultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Read moreConstruction of 30 mt explosive magazine building at right bank of yarjep river upstream of dam at tato-ii hep, shi-yomi, arunachal pradesh
Construction of 30 mt explosive magazine building at right bank of yarjep river upstream of dam at tato-ii hep, shi-yomi, arunachal pradesh
Read moreDesign and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Read moreUpgradation of 219 hp sel water pump with 410 hp sel engine couple with rkb 200/37, 4 stage at garacharma treatment plant
Upgradation of 219 hp sel water pump with 410 hp sel engine couple with rkb 200/37, 4 stage at garacharma treatment plant
Read moreof your Industry type